My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed Work Plan 1 <br /> TASK 1 • Kick-Off Meeting - Project TASK 3 DELIVERABLE: <br /> Management Team (PMT #1) ❑ Questionnaire. <br /> At this meeting an introduction of participants will occur,the ❑ BASELINE:TKDA will prepare base plans for use in the <br /> project objectives and schedule will be reviewed, and a conceptual site and building design using plans available <br /> schedule wii be set for the project.TKDA will gather available from ERMU. <br /> electronic and paper site,topographic and building plans for: <br /> City Office Area,overall site location plan and site plans for TASK 4 • Group Meeting #1 <br /> individual sites-downtown,wells,and other sites with Utility When the questionnaires have been returned to TKDA,we <br /> buildings and land. It would be helpful at best if cad plans are will set up individual group meetings with the PMT and <br /> available. designated staff of each of the eight groups listed above in <br /> Task 3.The objectives of these meetings are to: <br /> ATTENDEES:TKDA and Elk River Municipal Utilities Project <br /> Management Team ❑ Review and add to the questionnaire to refine it. <br /> ❑ Review existing space and equipment plans generated in <br /> TASK 2 • PMT Meetings Task 3. <br /> ❑ Review and document the designated staff's concerns and <br /> These are scheduled to occur at the end of major tasks and needs for their operations/work areas,i.e.,what can be <br /> are planned over the anticipated 14 week duration of the designed into the new facility that will make their jobs <br /> project.The objective of these meetings is three-fold: <br /> easier, more productive,and safer? <br /> ❑ To keep the entire PMT current on the actions completed. ❑ Review and document space and utility needs for each <br /> ❑ Gain feedback. group including electrical,mechanical,and <br /> ❑ Coordinate the information with the interests of the PMT. communications. <br /> ❑ Review and document the structural needs for each group <br /> TASK 2 DELIVERABLE: such as hoisting/lifting equipment and warehousing and <br /> Meeting minutes will be distributed to the PMT. racking requirements. <br /> TASK 3 • Develop Questionnaire and Baseline ❑ Review and document access requirements for each <br /> group. <br /> TKDA has developed a questionnaire for utility/maintenance » Do they need direct access to the outside or not? <br /> operations that will be modified to reflect the information What specific requirements does Customer Service <br /> needed from the following groups: <br /> have for counterwork,size of office cube that will be <br /> ❑ Administration used,and what size and type of printers/copiers,etc., <br /> ❑ Customer Service are required? <br /> ❑ Billing 1. Size and requirements of record storage. <br /> ❑ Electric Department » What specific requirements does Billing Service have for <br /> ❑ Water Department counterwork,size of office cube that will be used,and <br /> ❑ Engineering what size and type of printers/copiers,etc.,are <br /> ❑ Power Production required? <br /> ❑ Security <br /> 1. Size and requirements of record storage. <br /> These questionnaires will be sent to the PMT for distribution » What special needs does each group have that need to <br /> to the designated staff of each group and are to be completed be incorporated into the schematic design layouts? <br /> and returned to TKDA prior to the start of Group Meeting#1. <br /> ❑ In addition to completing questionnaires,TKDA will have all <br /> (The information garnered through this effort will be the <br /> the material—questionnaires and plans—on a laptop and will <br /> baseline from which the design needs will be formulated and work interactively with each group to accomplish the task <br /> documented.)In addition,during this time,TKDA will develop <br /> above using a projector and drawing/working with the laptop <br /> scaled plans showing the spaces occupied by each group <br /> to modify and change as required.The use of the computer <br /> and all larger fixed pieces of equipment. <br /> and projector becomes more important in later meetings. <br /> 4 <br /> City of Elk River I Municipal Utilities Building Study <br /> 148 <br />
The URL can be used to link to this page
Your browser does not support the video tag.