My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
292DesignGroup <br /> c Similar Project Experience Relevant Projects <br /> Medina Public Works and Police Facility 1 <br /> Renovation I Medina, MN <br /> I <br /> In 2012,the City of Medina purchased an existing 72,000 _;_„,----r,-- <br /> square foot office/warehouse building for use as their `T . <br /> public works and police facility, replacing a pole barn �``` <br /> used by public works and the cramped lower level of city <br /> hall used by the police department.The renovation of the newly acquired building included <br /> the following: �_ <br /> • Widening of existing overhead doors in the south garage <br /> to allow drive-through for larger public works vehicles <br /> • Construction of toilet/locker rooms <br /> • Construction of a vehicle maintenance area within the <br /> large warehouse space.(The vehicle maintenance area <br /> included a lube room,welding area and new bridge `� . ` <br /> crane.) ` �� ._ I� <br /> • Remodel of the existing office area to accommodate *l <br /> offices,meeting rooms and lunchroom areas for public ( '► �, <br /> works and police,a police squad room,evidence prep ,4 <br /> and storage,and a detention facility with sally-port h <br /> garage # <br /> • Upgrades to mechanical systems,lighting and power— -: il . <br /> including an emergency generator. ® <br /> _ �.". <br /> Existing interior areas allowed for storage of materials F <br /> and equipment, while an existing drive-through garage <br /> space at the north end provided space for cold storage <br /> and smaller vehicles. \ <br /> I <br /> t <br /> • Completion:2013 <br /> • Construction Cost:$2,698,000 <br /> • Team Members __,________„---,,,..< 4iir _ <br /> Mark Wentzell,Project Designer <br /> Pam Anderson,Project Manager <br /> • Client:City of Medina <br /> • Client Contact: -— _ <br /> Scott Johnson,City Administrator -- `° '" - <br /> 2052 County Road 24,Medina,MN 55340 -, <br /> 763.473 8840 <br /> 1 -� � <br /> scott.johnson @u.medma.mn.us <br /> f <br /> Elk River Municipal Utilities Proposal 10 <br /> 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.