Laserfiche WebLink
292DesignGroup <br /> c Similar Project Experience Relevant Projects <br /> Elk River Public Works Facility - =-' `� /' <br /> ,- ' -e Niu, ,x.!- <br /> Elk River, MN � ,� iz, <br /> '� %=i siti y a," ' <br /> This project included a major renovation (18,000 square I�` , _emu, _ f �} <br /> feet) to the existing Elk River Public Works Facility, as , F. I <br /> well as an addition (68,000 square feet)for large vehicle , ; . ° „ <br /> storage, vehicle and truck maintenance, offices and 1 „ It s. s -' ` <br /> support spaces. } :• `•� <br /> i ` <br /> Renovation work on the small vehicle garage, which ,, <br /> provides space primarily for the Parks Maintenance ✓` o� s , <br /> department,included upgrades to toilets,and additional �� <br /> space for a wood shop and storage. i©�,® <br /> The new addition included a large vehicle garage tilt, ∎/°' 41∎ . ,.. t..,,,i <br /> with a wash bay and storage for over 40 vehicles; a j /�*� * / r <br /> maintenance area with four vehicle and four truck repair .(�7 <br /> bays; a small engine repair area with bridge crane, lube ��� I��i a' �''oa _. @— <br /> room and storage;and an office area with locker rooms, - F� r <br /> lunchroom/training room,and sign shop. <br /> The majority of the addition's exterior is comprised <br /> of precast concrete panels, one of the most efficient <br /> materials for large space enclosure. Variations in color <br /> detail were incorporated to help break down the scale • Construction Completion:2013 <br /> of the addition's large volume. For example, wood was • Construction Cost:$8,730,000 <br /> used on the exterior of the office and support areas for • Team Members: <br /> its warmth and texture. Pam Anderson,Project Manager <br /> Mark Wentzell,Project Designer <br /> The new facility includes a number of "green design" • Client:City of Elk River <br /> features including skylights with daylighting controls, • Reference: <br /> fully-automated building controls, high efficiency Mark Thompson <br /> mechanical systems,durable,low maintenance materials Street Superintendent <br /> and bioretention and rain gardens for natural storm City of Elk River <br /> water management. mthompson @elkrivermn.gov <br /> 763.635.1120 <br /> The project also included a salt storage building. <br /> ' ' '':l'-;,--;,,,-,71.-,,,,.-„,,r.,..,,,,,:, ,,,,, ,,_,,..ii._..e <br /> AY0 <br /> I Elk River Municipal Utilities Proposal 9 <br /> 114 <br />