Laserfiche WebLink
292DesignGroup <br /> b Project Approach Project Understanding & Workplan <br /> • Developed civil layout including site plan/details,grading plan/details and utility plan/ - -,•,Ji . , <br /> details JI <br /> • Developed structural layout including building sub-grade foundation work,footings <br /> and foundation plans,floor and roof framing plans and written description of structural <br /> systems <br /> • Developed mechanical layout including underground waste and supply lines, <br /> mechanical equipment,distribution and systems description <br /> L_______T <br /> • Developed electrical layout including distribution, equipment, site and floor plan <br /> layout,distribution and site lighting and systems description <br /> • Preliminary specification by CSI Division <br /> • Estimate of probable construction costs and value engineering as developed in °conjunction with the Owner r c-: <br /> In addition to the deliverables outlined above the 292 team will make presentations to L;, , <br /> o __ <br /> staff and other review bodies as required by ERMU. i^ k r <br /> f1 C <br /> Construction Documents <br /> Prepare the documents that will provide the detailed drawings and specifications for <br /> the construction of the project that will become the basis fora contract between ERMU <br /> and the contractor for the project. --- 1 hi , 1 <br /> Work Products:A comprehensive construction document package. Deliverables are =` L J _ Ll -° <br /> based upon our defined project process guidelines and include: * n �_ �.1- � -�- -� j <br /> • Updated project and construction schedule <br /> • Final code review including code drawing,completed code review text and zoning ' �' " <br /> review drawings <br /> • Construction Document drawings including site plan,floor plans,reflected ceiling <br /> plans,roof plan,all exterior elevations,building and wall sections,large scale plan <br /> drawings-final layout,interior elevations-final layout,schedules and details <br /> • Final civil layout including site plan/details,grading plan/details and utility plan/ <br /> details <br /> • Final structural layout including building sub-grade foundation work,footings and <br /> foundation plans,floor and roof framing plans and structural details <br /> • Final mechanical layout including underground waste and supply lines,mechanical <br /> equipment, distribution systems, floor plan layouts, mechanical schedules and <br /> details <br /> • Final electrical layout including distribution, equipment, floor plan layouts, ; r`t <br /> electrical services distribution and site light lighting electrical schedules and details <br /> • Layout of specialty systems ARV—, <br /> • Final specification by CSI division <br /> • Assist in preparation of a final estimate of probable construction costs tI <br /> Bidding and Negotiation <br /> Assist Elk River Municipal Utilities in obtaining bids for the project. Interpret the <br /> documents and provide clarification to the bidders on the project. Prepare contracts ",. <br /> for the construction of the project. <br /> Construction Administration <br /> Observe the construction work for conformance to drawings and specifications,process <br /> shop drawings, evaluate contractor request for payment, prepare final punch list, <br /> Certificate of Substantial Completion,and project closeout. <br /> Elk River Municipal Utilities Proposal 6 <br /> 111 <br />