Laserfiche WebLink
292DesignGroup <br /> b Project Approach Staff Roles & Availability <br /> Elk River Municipal Utilities <br /> Commission <br /> Water Services-- Electric Services <br /> Z <br /> i <br /> mProject review and decision- <br /> a, <br /> J making team <br /> cu <br /> N <br /> .O <br /> L <br /> o. <br /> @ Project Manager/Architect <br /> I- Pamela Bakken Anderson,AIA,CID,LEED I <br /> c AP <br /> 0.0 <br /> a, 292 Design Group <br /> in <br /> Will be the key contact person and <br /> oversee all phases of the work <br /> Project Designer <br /> Mark Wentzell,AIA AP <br /> Mechanical Engineering 292 Design Group Electrical Engineering <br /> Mike Woehrle,PE Jeff Piehl,PE <br /> Nelson-Rudie&Assoc. I Nelson-Rudie&Assoc. <br /> Will lead plumbing& Will lead power&lighting <br /> HVAC planning&design Structural Engineering planning&design <br /> Joe Pearce,PE <br /> Nelson-Rudie&Assoc. <br /> iii...— Will lead structural design <br /> services <br /> Availability and Capability <br /> Each of the staff members listed above are currently available to begin work with <br /> Elk River Municipal Utilities and will remain with the project throughout planning, <br /> design and construction. Additional design, drafting and support staff will be �r <br /> assigned to the project as required by the schedule and project requirements. ' <br /> Copies of individual staff resumes are provided under section E of this proposal. <br /> Elk River Municipal Utilities Proposal 7 <br /> 112 <br />