My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
292DesignGroup <br /> b Project Approach Staff Roles & Availability <br /> Elk River Municipal Utilities <br /> Commission <br /> Water Services-- Electric Services <br /> Z <br /> i <br /> mProject review and decision- <br /> a, <br /> J making team <br /> cu <br /> N <br /> .O <br /> L <br /> o. <br /> @ Project Manager/Architect <br /> I- Pamela Bakken Anderson,AIA,CID,LEED I <br /> c AP <br /> 0.0 <br /> a, 292 Design Group <br /> in <br /> Will be the key contact person and <br /> oversee all phases of the work <br /> Project Designer <br /> Mark Wentzell,AIA AP <br /> Mechanical Engineering 292 Design Group Electrical Engineering <br /> Mike Woehrle,PE Jeff Piehl,PE <br /> Nelson-Rudie&Assoc. I Nelson-Rudie&Assoc. <br /> Will lead plumbing& Will lead power&lighting <br /> HVAC planning&design Structural Engineering planning&design <br /> Joe Pearce,PE <br /> Nelson-Rudie&Assoc. <br /> iii...— Will lead structural design <br /> services <br /> Availability and Capability <br /> Each of the staff members listed above are currently available to begin work with <br /> Elk River Municipal Utilities and will remain with the project throughout planning, <br /> design and construction. Additional design, drafting and support staff will be �r <br /> assigned to the project as required by the schedule and project requirements. ' <br /> Copies of individual staff resumes are provided under section E of this proposal. <br /> Elk River Municipal Utilities Proposal 7 <br /> 112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.