My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. BASR 04-27-1999
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
1997-1999
>
1999
>
04-27-1999
>
4.2. BASR 04-27-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2015 11:44:39 AM
Creation date
5/19/2015 11:44:38 AM
Metadata
Fields
Template:
City Government
type
BASR
date
4/27/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> • H <br /> Howard R. Green Company <br /> L CONSULTING ENGINEERS <br /> April 15, 1999 <br /> File: 806950J-0240 <br /> Mr. Steve Wensman <br /> City of Elk River <br /> P.O. Box 490 <br /> 13065 Orono Parkway <br /> Elk River, MN 55330 <br /> RE: FURNITURE AND THINGS WAREHOUSE EXPANSION <br /> Dear Ms. Wensman: <br /> As you requested, we have reviewed the submittal for the Furniture and Things <br /> Warehouse expansion located in the Rail 10 development on Ulysses Street. The <br /> review package consisted of a site plan prepared by John Weicht & Associates and a <br /> grading drainage and erosion control plan prepared by John Oliver&Associates. <br /> Based upon our review, we have two comments: <br /> 1. Both plans show a fire lane to be constructed around the north and east side of <br /> the building. The site plan shows the fire lane to be 24 feet wide, except at the <br /> northeast and northwest corners of the proposed expansion where the fire lane is <br /> narrowed to 12 feet because of the close proximity of the property line. The <br /> grading drainage and erosion control plan shows a 15 foot wide fire lane to be <br /> built of aggregate with topsoil and seeding placed on top of it. I have discussed <br /> this issue with the Fire Chief, I believe he requires a 20 foot wide bituminous fire <br /> lane. He has indicated, however, where the fire lane encroaches close to the <br /> property line around the northeast and northwest corners of the building, he <br /> would agree to a 12 foot wide bituminous fire lane with an additional 8 foot <br /> aggregate fire lane covered by topsoil and seeding. This raises the issue of the <br /> need for variance because of the setback requirement of 10 feet to the fire lane. <br /> Obviously, the portion built of aggregate base with seeding on top will be much <br /> closer than 10 feet to the property line. We believe this portion of the fire lane <br /> should be considered to need a 10 foot separation from the property line and <br /> therefore, would require a variance. <br /> • <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.