My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. BASR 04-27-1999
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Board of Adjustments
>
BOA Packets
>
1997-1999
>
1999
>
04-27-1999
>
4.2. BASR 04-27-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2015 11:44:39 AM
Creation date
5/19/2015 11:44:38 AM
Metadata
Fields
Template:
City Government
type
BASR
date
4/27/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Steve Wensman <br /> • <br /> April 15, 1999 <br /> Page Two <br /> 2. It is not shown on the plans where the existing septic system and well are <br /> located. However, with the expansion of the building and necessary expansion <br /> of the driving and parking area and also a future parking area shown out near the <br /> street, it does not leave any room for the on site sewer system and well. This <br /> area is scheduled to receive City sanitary sewer and water as part of the East Elk <br /> River Improvement. However, those utilities may not be available for hook-up <br /> until late next year. This raises two questions. One, are the existing on-site <br /> facilities being disrupted and/or removed due to this expansion and, two, should <br /> this expansion require the property owner to connect to sanitary sewer and water <br /> when it becomes available. <br /> If you have any questions regarding these issues, please call. <br /> Sincerely, <br /> HOWARD R. GREEN COMPANY <br /> Terry J. faurer, P.E. <br /> TJM:vtw <br /> • <br /> Howard R. Green Company <br /> CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.