My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 03-02-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
03-02-2015
>
8.2. SR 03-02-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2015 1:20:12 PM
Creation date
2/27/2015 9:37:02 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14r:: <br /> IUCE LAKE <br /> CO Iu TR U C T , G DID 0 U P <br /> January 27, 2015 <br /> Bolton & Menk, Inc. <br /> 12224 Nicollet Ave. <br /> Burnsville, MN 55337 <br /> ATTN: Seth Peterson, PE <br /> RE: Elk River Wastewater Treatment Facility Improvements <br /> RLCG Project No. 1422 <br /> COP#04 — Project Delays <br /> Seth, <br /> Below is a summary of the delays to date for the Elk River Wastewater Treatment <br /> Plant project to date. <br /> Delay Start of Delay End of Delay Number of Calendar <br /> Days Delayed <br /> Notice to Proceed 8/3/14 10/6/14 64 <br /> MPCA Permit 10/6/14 10/28/14 22 <br /> Black Cinder Material 10/28/14 12/19/14 52 <br /> Total Days 138 <br /> Delayed <br /> Following typical construction project timelines, Rice Lake bid this project <br /> anticipating receiving the Notice to Proceed around 8/1/14. We would then have <br /> been able to start the major concrete work on the Aeration Basin shortly after. Rice <br /> Lake has been delayed a total of 138 days due to the issues with the Notice to <br /> Proceed, MPCA Permit and the Black Cinder Material found onsite. <br /> Rice Lake has the following options to move forward with: <br /> 1) With the construction of the Aeration Basin now into the winter months, <br /> winter conditions costs will be a major factor for the concrete work. <br /> However, at bid time we planned on finishing one half of the Aeration Basin <br /> last fall, and the second half this spring. By planning on constructing the <br /> Aeration Basin this way, we were able to minimize our winter conditions <br /> 22360 County Road 12 costs. Now that we are into the winter months, Rice Lake is requesting to <br /> PO Box 517 be compensated for winter condition costs in the amount of$259,991.59 if <br /> Deerwood, MN 56444 <br /> PH 218-546-5519 work on the Aeration Basin must continue this winter. We would also <br /> FX 218-546-7016 require a time extension of 138 calendar days for the delays we have <br /> experienced to date. Attached is a summary of the additional costs for <br /> option 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.