My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 03-02-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
03-02-2015
>
8.2. SR 03-02-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2015 1:20:12 PM
Creation date
2/27/2015 9:37:02 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00991—CHANGE ORDER <br /> No. 1 <br /> PROJECT: WWTF Improvements <br /> DATE OF ISSUANCE: 2/19/2015 EFFECTIVE DATE: <br /> OWNER: City of Elk River, Minnesota <br /> ENGINEER'S Project No.: T21.106811 <br /> CONTRACTOR: Rice Lake Const. Group ENGINEER: Bolton&Menk, Inc. <br /> You are directed to make the following changes in the Contract Documents. <br /> Description: <br /> The project was bid in June 2014 and Notice to Proceed was not received until October 2014. This delay was due to the <br /> MPCA not having the NPDES permit and EAW approved. Plan and specification approval was not granted until <br /> October 28,2014. At that time construction could start. Shortly after construction started a black cinder material was <br /> found in the excavation area and this material required special disposal. There were time delays due to testing of the <br /> material and determining locations where the material could be disposed. Due to these delays the contractor is <br /> requesting additional costs and time extension. We recommend Option 1 as outlined in Rice Lake's letter. <br /> Reason for Change Order: <br /> Delay in obtaining plan and specification approval,the NPDES permit and EAW from the MPCA. Also,black cinder <br /> material was discovered in the excavation area and required special disposal. <br /> Attachments: (List documents supporting change) <br /> See attached letter from Rice Lake Construction Group dated Jan. 27,2015. <br /> CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br /> Original Contract Price Original Contract Times <br /> Substantial Completion :700 days or dates <br /> $16.525.200.00 Ready for final payment :700 days or dates <br /> Net changes from previous Change Orders No.-to No. I Net changes from previous Change Orders No.-to No.I <br /> $0 0 days <br /> Contract Price Prior to this Change Order Contract Times prior to this Change Order <br /> Substantial Completion :O days or dates <br /> $16.525.200.00 Ready for final payment :0 days or dates <br /> Net Increase of this Change Order Net Increase of this Change Order <br /> $259,991.59 138 days <br /> Contract Price with all approved Change Orders Contract Times with all approved Change Orders <br /> Substantial Completion :838 days or dates <br /> $16.785.191.59 Ready for final payment :838 days or dates <br /> RECOMMENDED: — APPROVED: ACCEPTED: <br /> By �� V� By: By: <br /> Engineer(Authorized Signature) Owner(Authorized Signature) Contractor(Authorized Signature) <br /> Date: 2/19/2015 Date: Date: <br /> EJCDC No. 191008-B(1990 Edition) <br /> Prepared by the Engineers Joint Contract Documents Committee and endorsed by The Associated General Contractors of America. <br /> T21.106811—Elk River,MN CHANGE ORDER <br /> Wastewater Treatment Facility Improvements PAGE 00991-1 <br />