My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 03-02-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
03-02-2015
>
8.2. SR 03-02-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2015 1:20:12 PM
Creation date
2/27/2015 9:37:02 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/2/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) Our other option is to wait until spring to start the work on the Aeration <br /> Basin. However, we would then run into price escalations on concrete, <br /> rebar material, rebar install and labor. Rice Lake would also incur additional <br /> overhead costs from the time extension that would be required. The total <br /> cost would be $294,760.81, and we would also require a time extension of <br /> 245 calendar days. Please note we would continue work on the Biosolids <br /> Building No. 2 and also the RAS/WAS wet well, and would cover the winter <br /> conditions costs on these structures. Attached is a breakout of the costs for <br /> option 2. <br /> Please let us know how you would like to proceed. If you have any questions, or <br /> require additional information, do not hesitate to contact us. <br /> Sincerely, <br /> Rice Lake Construction Group <br /> Matt Perpich <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.