My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 12-03-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
12/03/2001
>
6.3. SR 12-03-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:31 AM
Creation date
4/28/2004 8:17:49 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/3/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pavement Reha,~,Htation Program 11/12/01 <br />Street Improvements Schedule <br /> <br />STREET QUINN RAILROAD DR. RAILROAD DR RAILROAD DR RAILROAD DR RUSH RUSH <br />FROM 5TH ST. JACKSON IRVING GATES 2ND ST. TH 10 5TH ST. <br />TO 4TH ST. IRVING MAIN I;~ND ST. EVANS 5TH ST. CTH ST. <br />COMMON EXCAVATION CY $ 10.00 801.1 838.1 1411.7 262.5 2000.8 593.1 929.41 <br />REMOVE BITUMINOUS PAVEMENT SY $ 3.00 1281.8 1676.1 2016.7 360.0 2744.0 948.9 2018.2! <br />REMOVE SIDEWALK SF $ 2.50 2060.(] 2155.0 0.0 0.0 0.0 0.0 2390.0 <br />REMOVE CONCRETE CURB & GUq-FER LF $ 3.50 0.(~ 0.0 1452.0 0.0 0.0 0.0 956.0 <br />MAILBOX RELOCATION LS $ 500.00 0.C 0.0 0.0 0.0 0.0 0.0 0.0 <br />MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0i 0.0 0.0 0.0 0.0 0.0 0.0 <br />AGGREGATE BASE, CLASS V TON $ 10.50 524.5 547.2 922.9 171.3 1306.6 387.7 607.5 <br />TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 164.3 171.9 289.5 53.8 410.3 121.6 190.6 <br />TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 127.8 133.7 225.2 41.9 319.1 94.6 148.2 <br />BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 66.4 69.4 117.0 21.8 165.8 49.1 77.0 <br />CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 824.0 862.0 1452.0 270.0 2058.0 610.0 956.0 <br />6" CONCRETE DRIVEWAY AND APRON SY $ 34.00 72.2 7.9 39.4 0.0 23.7 15.8 122.0 <br />2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 49.8 24.9, 124.4 0.0 49.8 24.(` 49.8 <br />' OONCRETE SIDEWALK SF $ 2.50 4944.0 2586.0 0.0 0.0 0.0 3660.0 5736.0 <br />PEDESTRIAN RAMP EA $ 300.00 4.0 2.0 0.C 0.0 0.0 4.(] 4.0 <br />SODDING, LAWN AND BOULEVARD SY $ 3,00 915.6 957.8 1613.3 300.0 2286.7 677.8 1062.2 <br />FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 6.3 6.3 12.5 0.0 0.0 12.5 12.5 <br />FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 1.0 2.0~ 1.0 1.0 1.(] 2.0 <br />ADJUST GATE VALVE EA $ 150.00 0.0 1.0 0.0 0.0 0.0 1.0 1.0 <br />ADJUST MANHOLE EA $ 200.00 1.0 3.0 2.0 0.0 0.0 0.0 0.0 <br />STORM SEWER LF $ 50.00 412.0 431.0 726.0 135.0 1029.0 305.0 478.0 <br />STREET LIGHTING LS $ 200.00 1.0 1.0 1.0 1 .(] 1.0 1.0 1.0 <br /> <br /> TOTAL ESTIMATED CONSTRUCTION COST: $ 80,184.00 $ 75,556.73 $ 110,216.22 $ 19,053.64 $ t44,145.12 $ 54,717.58 $ 99,145.62 <br /> 28% OVERHEAD: $ 22,451.52 $ 21,155.88 $ 30,860.54 $ 5,335.02 $ 40,360.63 $ 15,320.92 $ 27,760.77 <br /> TOTAL ESTIMATED PROJECT COST: $ 102,635.52 $ 96,712.62 $ 141,076.76 $ 24,388.66 $ 184,505.76 $ 70,038.50 $ 126,906.40 <br /> TOTAL COST: $ 6,936,053.65 <br /> <br />O:\Proj\8024OOj\costest-report 10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.