My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. SR 04-26-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
04/26/2004 - SPECIAL
>
3.0. SR 04-26-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:30 AM
Creation date
4/23/2004 3:21:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/26/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transportation Plan Goals <br /> Page 3 <br /> <br />TABLE I 0 (cont.) <br />SUMMARY OF RECOMMENDED ROADWAY IMPROVEMENT ACTION <br /> <br />Roadway Improvement Action Recommendation Objective <br />193rd/198th Identify future corridor alignment for construction. Create an · Expand existing system of <br />Corridor from maproved continuous east-west roadway that would cross over functionally classified roads <br />CSAH 1 to CSAH TH 169. Classify roadway as a Major Collector to improve mobility. <br />13 <br />CR 44 · Expand existing system of <br />(Meadowvale Rd) Classify roadway as a Minor Collector. Roadway design functionally classified roads <br />From CSAH 1 to (shoulder and lane width) may be improved, to improve mobility. <br />TH 10 <br /> · Expand existing system of <br />Tyler St Complete corridor study to determine if and how Roadway functionally classified roads <br />FromcR 33CSAH 13 to design (shoulder, lane width, access) should be improved, to improve mobility. <br />School St/Elk <br />Hills Dr Identify future corridor alignment extensions for construction. · Expand existing system of <br />Extensions Create an improved continuous east-west roadway that would functionally classified roads <br />From CR 44 to CR cross over TH 169. Classify roadway as a Major Collector to improve mobility. <br />77 and from Line <br />Ave to CSAH 13 <br /> <br /> CR 32/CR 72/ Create a continuous north-south roadway that would cross the · Expand existing system of <br /> /Zebulon/Waco Elk River and connect to Waco Street at the current TH 10 functionally classified roads <br /> From north city intersection. Classify roadway as a Major Collector. to improve mobility. <br /> limits to CR 30 <br /> Identify future corridor alignment for construction. Expand <br /> existing roadway to a 2-lane paved roadway with left and right <br /> CR 40 mm lanes at key intersections and shoulders. Construct a · Expand existing system of <br /> (Cleveland/Jar, As) roadway connection between CSAH 12 and 165th Ave/Jarvis. functionally classified roads <br /> from CSAH 13 to Classify road segment as a Minor Arterial. Roadway upgrade to improve mobility. <br /> TH 10 should coincide with adjacent development. Connection to <br /> 165th/Jarvis is dependent on redevelopment of Cargill <br /> holdings. <br /> · Expand existing system of <br /> CSAH 1 Classify roadway as a Minor Arterial. As indicated in Table 3, functionally classified roads <br /> (Elk Lake Rd) consider completing safety study. Safety study may lead to to improve mobility and <br /> from north city roadway improvement recommendations, possibly safety (if improved). <br /> limits to GR 32 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.