Laserfiche WebLink
Transportation Plan Goals <br /> Page 2 <br /> <br />TABLE 10 (cont.) <br />SUMMARY OF RECOMMENDED ROADWAY IMPROVEMENT ACTION <br /> <br />Roadway Improvement Action Recommendation Objective <br /> · Expand existing system of <br />165t~ Ave from TH Classify as a Minor Collector functionally classified roads <br />10 to Jarvis St to improve mobility. <br /> Convert School Street in to a Mane roadway with a center left · Eliminate/reduce existing <br />School Street from turn lane and implement intersection improvements identified vehicle crashes and <br />CSAH 1 to TH 169 in previously completed safety study, congestion. <br /> Classify roadway as a Minor Arterial and develop east-west <br /> connections into Big Lake Township and Anoka County. <br />CR 33 <br /> Roadway could be direcdy connected to 211th Avenue in Big · Expand existing system of <br />(Ranch/205th/209th) Lake Township and CR 31 (Viking Blvd) in Anoka County. functionally classified roads <br />from west city Coordination efforts with both Big Lake Township and to improve mobility and <br />limits to east city possibly safety (if improved). <br />limits Anoka County would be needed. As indicated in Table 3, <br /> consider completing a safety study. Safety study may <br /> recommend improvements. <br /> · Eliminate/reduce existing <br />CSAH 12 vehicle crashes and expected <br />(181~ Ave) from Expand roadway to a 4-lane divided arterial with right and left future congestion. <br />CSAH 13 to east turn lanes at key intersections. · Provide design continuity <br />city limits with roadway to the east. <br /> Expand roadway and add right and left turn lanes at key <br />CR 30 intersections. Number of additional lanes constructed may <br />(Mississippi/Main) Eliminate/reduce expected <br /> vary depending on traffic volumes forecast and the "context" o <br />from Naples St to provided by the adjacent land use. Conduct a corridor study future congestion. <br />TH 10 to specifically determine what improvements should be <br /> implemented. <br /> Expand roadway and add right and left turn lanes at key <br />CR 77 intersections. Number of additional lanes constructed may <br /> (Proctor Ave) vary depending on completion of adjacent roadway · Eliminate/reduce expected <br /> from CSAH 1 to improvements and "context" provided by adjacent land use. future congestion. <br /> CR 33 Conduct a corridor study to specifically determine what <br /> improvements should be implemented. <br /> · Expand existing system of <br /> CR 35 Classify roadway as a Minor Collector. As indicated in Table functionally classified roads <br /> (192na Ave) 3, consider completing a safety study. Safety study may to improve mobility and <br /> from CR 72 to CR recommend improvements, possibly safety (if improved). <br /> <br /> <br />