Laserfiche WebLink
Elk River Comprehensive Plan <br />62 / Chapter 6: Transportation <br />Figure 6-8. Proposed Highway Improvements (Long-Term) <br />N <br />Proposed Interchange <br />Proposed Underpass <br />Existing Interchange <br />Interchange Search Area <br />Construction of interchanges will eliminate existing access <br />pointsontoUS10andUS169Frontageroadsarealsoproposed <br />Existing Pedestrian Overpass <br />209th Ave <br />213th Ave <br />207th Ave <br />Mississippi Rd <br />221st Ave <br />Ja <br />r <br />v <br />i <br />s <br /> <br />S <br />t <br />Tw <br />i <br />n <br /> <br />L <br />a <br />k <br />e <br />s <br /> <br />R <br />d <br />192nd Ave <br />R <br />a <br />nch Rd <br />221st Ave <br />E <br />l <br />k <br /> <br />L <br />a <br />k <br />e <br /> <br />R <br />d <br />Twin L a k e s R d <br />181st Ave <br />165th Ave <br />175th Ave <br />Main St <br />Pro <br />ct <br />o <br />r <br /> <br />Rd <br />Fillmore St <br />Tyler St <br />Ze <br />b <br />u <br />l <br />o <br />n <br /> <br />R <br />d <br /> <br />M <br />e <br />a <br />d <br />o <br />w <br />vale Rd <br />Ja <br />ckson <br /> Av <br />e <br />School St <br />1 9 7 t h Ave <br />1 9 3 r d A ve <br />Main St <br />1 71st St <br />SSttt <br />Construction of <br />interchanges will <br />eliminate existing access <br />points onto US 10 and US <br />169. Frontage roads are <br />also proposed in locations <br />along the corridor, but are <br />not shown on this map.