• <br /> • <br /> Project Approach <br /> Bolton&Menk,Inc.understands the importance of Task 2: Topographic Survey (Project 1 and 3) <br /> not only achieving the desired outcome of each of the Objective: The creation of a base map identifying above <br /> following tasks,but also completing them on time and below ground existing features in electronic format. <br /> and within budget. It is our commitment to facilitate a This base map will be utilized as the basis and background <br /> successful process for the City of Elk River on these for final design. <br /> projects.We will put special emphasis on working with <br /> City staff to assure the project's success. Description: Gather pertinent field information on City <br /> infrastructure, adjacent buildings,right-of-way,contours, <br /> Based on the RFP work tasks presented, a detailed and private small utilities.The survey will be completed <br /> description of how we would successfully complete the within the corridor rights-of-way and will include all <br /> scope of work tasks is provided on the following pages. visible features such as,but not limited to,pavements,curb <br /> lines,manholes,catch basins,valves,sidewalks,turf areas, <br /> Task 1: Feasibility Report (Project 1 and 3) driveways,power poles,tree gardens,mailboxes,retaining <br /> Objective: Preliminary layout of desired improvements, walls,etc.Underground utility information will be located <br /> identification of issues or risks to the project's success and described per available as-builts,field markings, and <br /> requiring greater exploration during final design, private utility map information facilitated through a Gopher <br /> and communication of these elements to the project State One Call.Manhole reports will also be completed <br /> stakeholders. for located manholes and catch basins. Right-of-way and <br /> property lines will be illustrated based on found field <br /> Description: Preliminary design will be performed in monumentation and plat information received from the City. <br /> coordination with City staff.Major work components of <br /> this task include the following: Deliverables: Topographic survey information. <br /> • Collection of existing record or as-built plans <br /> from City staff and incorporate the findings in the Task 3: Public Involvement and Meetings <br /> preliminary and design phase. (Project 1, 2, and 3) <br /> • Right-of-way impacts along Yale Street. Subtask 3.1: Public Involvement <br /> • Preliminary design of the Yale Street alignment,width, Objective:Attend and present information. <br /> and typical section. <br /> • Cost estimates for the 2015 Street Improvements and Description: The public will be afforded two <br /> Yale Street. opportunities through the development of this project. <br /> • Review of pertinent comprehensive plans and study The first informational meeting will share the project <br /> documents provided by City staff.Bolton&Menk will goals and objectives along with the concept.The second <br /> make recommendations for improvements based on informational meeting will be held prior to construction <br /> outcomes and objectives identified in those documents. to share with the public the plans,construction stages, and <br /> durations. Comments will be taken at the meetings and <br /> Deliverables: Preliminary plans for Yale Street will be summarized.Additional information regarding Bolton& <br /> provided with the feasibility report. City staff will be Menk's public and stakeholder involvement is provided in <br /> provided the feasibility study in advance of its required the Additional Information section. <br /> submittal to the City Council, at which time staff may <br /> comment on the preliminary plans. Deliverables: Copies of meeting notes and comments, any <br /> necessary project analysis,project maps,layouts, and other <br /> figures/graphics for meetings. <br /> 2015 Improvements I City of Elk River, Minnesota 1 <br />