Laserfiche WebLink
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> February 11, 2014 6.1 <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had four new services. <br /> • Continue working on the Triple Deck Feeder rebuild. <br /> • Continue tree trimming. <br /> • Finished testing the overhead and underground protective grounds and finished testing <br /> the fiberglass hot sticks. Both of these are done annually. <br /> • Working on fixing problems that the infrared camera finds. We have found bad elbow <br /> arresters, overhead connections on a riser pole, elbows in a three phase transformer and a <br /> blade in the substation that needed to be replaced. <br /> • We started changing out 18 high pressure sodium light fixtures to LED fixtures on <br /> Freeport Avenue between Jackson Street and School Street. <br /> • Had to switch out the Otsego substation transformer to get the relay fixed that protects <br /> the transformer if a fault occurs. USG had a relay for us to use until ours gets fixed. <br /> . IIEIED I1 <br /> Page I of l � INATURE� <br /> Reliable Public <br /> Power Provider P OWENEe To SERVE <br /> 192 <br />