Laserfiche WebLink
(e) Updated,full-size,contour map which indicates the elevations of <br /> all fill areas <br /> (f) Assessment of the Financial Assurances Plan. <br /> (g) Evaluation of the Water Monitoring System and a proposal for <br /> continued sampling and analysis. <br /> (h) Detailed evaluation of all water quality results by means of tables <br /> and graphs. <br /> (i) A groundwater contour map based on the previous years' <br /> groundwater level data. <br /> (j) Annually assess the effectiveness of active landfill gas control <br /> operations based on the results of groundwater and landfill gas <br /> monitoring and incorporate the evaluation in the MPCA Annual <br /> Report for the landfill. <br /> (k) The Annual Operating Report must include a full-sized <br /> engineering plan to fully illustrate all facility features reviewed in <br /> the annual report(landfill gas probes,monitoring wells,gas <br /> collection infrastructure,leachate recirculation infrastructure,etc). <br /> The Plan must identify permitted and remaining volumes <br /> (1) The Annual Operating Report typically includes information <br /> concerning the pressure jetting of the leachate collection system. <br /> ERL must provide a discussion of any major maintenance <br /> activities or corrective actions performed in the Annual Report. <br /> (m) ERL must provide a list of rejected waste loads and summary with <br /> the Annual Operating Report. A summary and analysis of random <br /> load inspections(as provided in section 4.2.1.of the April 2008 <br /> Industrial Solid Waste Management Plan)must be provided with <br /> the Annual Operating Report. <br /> (08) Construction Quality Assurance _- Comment[HR31:ERL has requestedthat this <br /> A,-og-.,.,, xh 11 h-c a ndde-dd to .1.,c,,,ti,o„t....mp1;.nee,w ith N4NDOT 19'77.2 B paragraph be reworded Any suggestions? <br /> A Construction Quality Assurance(CQA)Report shall be submitted to the <br /> City prior to the placement of waste on newly constructed lined areas.A CQA <br /> report shall also be submitted for Landfill areas which receive final cover.A CQA <br /> report shall also be submitted for installation of leachate recirculation drainfield <br /> areas to document position within the cell,suitable base contours and piping <br /> 10 <br />