My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 10-21-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
10-21-2013
>
7.1. SR 10-21-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2013 11:27:55 AM
Creation date
10/17/2013 11:24:10 AM
Metadata
Fields
Template:
City Government
type
CCM
date
10/21/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the monitoring event. All gas probe monitoring data must be <br /> fully evaluated in the annual operating report. <br /> (e) The current air monitoring for landfill gas emissions field survey is <br /> only conducted for the topslope area and accounts for roughly 20 <br /> percent of the fill area. There is a higher likelihood that emissions <br /> will occur on the sideslope based on the horizontal stratification of <br /> the waste and preferred movement of landfill gas. ERL shall <br /> comply with the Landfill Gas Migration Monitoring Plan <br /> submitted in March 2012 which includes the FRr ..,,,si*submit <br /> modified n mbient ir- r onitor-in.Plan to in.ludo sideslope and <br /> topslope areas that can be safely traversed at the time of the <br /> monitoring event. <br /> If concentrations exceed 500 ppm explosive gas(calibrated to <br /> methane),corrective actions are required to amend the landfill <br /> cover to mitigate fugitive emissions. This requirement is important <br /> in identifying fugitive gas emissions/odors and ensuring that site <br /> conditions are corrected to mitigate their effects. <br /> (06) Sampling and Analysis <br /> Plan.The Phase ry Water-Quality Monitor-i g Wo fk The Sampling and Analysis <br /> Plan,which describes the sampling frequency,parameters,protocols and <br /> reporting frequency for landfill gas,leachate,leachate piezometers,leachate <br /> lysimeters,residential wells,groundwater monitoring wells and surface water <br /> shall be assessed annually to reflect changes in the monitoring systems.The Work <br /> Plan shall yield adequate information for assessing the effectiveness of the landfill <br /> gas control system in decreasing VOC contaminants in the groundwater.The <br /> proposed compliance boundary within the Plan is not approved because it <br /> incorporates City property inside the compliance boundary. The compliance <br /> boundary will be limited to the Landfill Property. Corrective actions(potentially <br /> associated with contaminant migration)on City property,which potentially limit <br /> the use of City property,are not allowed. <br /> (07) Annual Operating Report.An Annual Operating Report shall be submitted <br /> with the following supplemental items. <br /> (a) Annual Waste Disposal Volume. <br /> (b) Schedule of construction activities for the forthcoming year. <br /> (c) Type and-Quantity of Material Disposed. <br /> (d) Remaining permitted capacity <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.