My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 10-21-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
10-21-2013
>
7.1. SR 10-21-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2013 11:27:55 AM
Creation date
10/17/2013 11:24:10 AM
Metadata
Fields
Template:
City Government
type
CCM
date
10/21/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
elevations. The report shall demonstrate that the work was completed to the plan <br /> specifications.The Report shall be certified by an engineer registered in the State <br /> of Minnesota and shall include but not be limited to: <br /> (a) All relevant construction specifications; <br /> (b) All shop drawings for prefabricated components; <br /> (c) Photo documentation of all critical aspects of construction; <br /> (d) Deflection testing results for leachate collection and transmission <br /> pipes; <br /> (e) Narrative description of all as-built variances from the plans and/or <br /> specifications; <br /> (f) As-built cross-sections of the liner subgrade; <br /> (g) As-built elevations for all pipe inlets and outlets and pump- <br /> on/pump-off controls; <br /> (h) Completed manufacturer warranties; <br /> (i) All physical testing results for soils and other materials used in the <br /> construction <br /> ERL must prepare detailed record drawings/documents of recirculation <br /> drainfield construction,which are certified by an engineer. The drawings will <br /> include survey measurements of the drainfield areas to document position within <br /> the cell, suitable base contours and piping elevations. All construction must be <br /> fully documented. <br /> (9) Barrier Layer Construction Notification.Licensee shall notify the City at <br /> least two(2)days in advance of liner barrier layer installation or final cover <br /> barrier layer installation.Licensee shall assist the City in arranging inspection of <br /> the site at any reasonable time the City requests.The Licensee shall keep the City <br /> informed of ongoing construction progress and shall specifically notify the City of <br /> significant changes encountered in the geological,hydrological,or construction <br /> conditions.The City may reasonably require work,which is covered or otherwise <br /> obscured prior to City inspection,to be re-excavated for City inspection. <br /> (10) Temporary Fencing-On Site Litter Control.Litter control fences shall be <br /> maintained around the working area(s)of the landfill to prevent the blowing of <br /> paper or other litter on or off site.The Licensee shall assign employees to engage <br /> in a regular and routine program to inspect the Landfill Site and clean up areas <br /> where litter accumulates on the Landfill Site. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.