My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 10-21-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
10-21-2013
>
7.1. SR 10-21-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2013 11:27:55 AM
Creation date
10/17/2013 11:24:10 AM
Metadata
Fields
Template:
City Government
type
CCM
date
10/21/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pfoposalPlan. ERL <br /> final eover-and ill provide a summary of related activities in the <br /> annual operating report. <br /> (b) ERL has proposed that the leachate cleanout risers will be <br /> perforated along a portion of the sideslope. ERL has committed to <br /> conduct active extraction from cleanout risers. <br /> (c) There have been a number of leachate seeps which have occurred <br /> in recent years. Documentation on the precise location of seeps <br /> has not been developed. This information is critical in potential <br /> problem resolution during later stages of landfill operation. The <br /> documentation of the seeps must include an approximate <br /> coordinate position with an elevation. This would also enable a <br /> more useful evaluation of the potential relationship with the <br /> leachate recirculation system. <br /> (d) Leachate head shall not exceed a maximum of 12 inches for any <br /> area of the liner. The Landfill shall monitor leachate head levels <br /> weekly and submit results to the City annually. <br /> (05) Gas Collection and Monitoring System.Licensee shall conduct active <br /> landfill gas collection in accordance with approved plans and shall construct <br /> additional phases of the active gas control system during site operation and at the <br /> time of final cover construction. Optimal gas collection system design and <br /> operation is necessary to control and reduce the impact of odors from the Site. <br /> (a) Operation of the Active Gas Collection System shall be managed <br /> to mitigate landfill gas migration and ongoing ground water <br /> contamination from the unlined portion of the Landfill. <br /> (b) ERL shall provide-implement the proposed additional design <br /> features to reduce the potential of fugitive emissions in the vicinity <br /> of landfill liner transition berm; <br /> (c) ERL has proposed that the leachate cleanout risers will be <br /> perforated along a portion of the sideslope. ERL has committed to <br /> conducting active extraction from cleanout risers. <br /> (d) Significant positive pressure readings for gas probes have been <br /> indicated over the past several years. This condition may indicate <br /> landfill gas migration beyond the waste boundaries. In order to <br /> fully evaluate this situation,the landfill must collect and report <br /> landfill gas concentration and pressure for each-probe where <br /> detectable levels of landfill gas are present. The landfill must also <br /> collect temperature and barometric pressure for the site at the time <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.