Laserfiche WebLink
amount,and the size of the escrow,are subject to change based on <br /> circumstances that were not anticipated by the parties at the time of <br /> budgeting, including but not limited to the costs of responding to <br /> incidents,or otherwise by agreement of the parties. <br /> 7.) Buffering and Screening. Licensee shall provide buffering and screening <br /> as required by the CUP approved on September 19,2011. <br /> 8.) Closure and End Use Plan. Prior to closure of the Landfill,City and <br /> Licensee will attempt in good faith to mutually determine an appropriate end use <br /> for the portion of the Landfill within City and decide whether an end use plan will <br /> be required to implement this use. In the interim,Licensee will establish and <br /> maintain sustained vegetative growth and adequate vegetation cover upon the <br /> closure of each phase of the Landfill. This Permit does not obligate the Licensee <br /> to apply for or City to approve of a particular end use plan. <br /> 9.) Specific Additional Requirements. <br /> (01) Leachate and LFG Condensate Transmission Pipes. Leachate and LFG <br /> condensate transmission pipes shall be designed to ensure that double <br /> containment and adequate leak detection exists as approved by the MPCA, <br /> County and City. Licensee shall verify to the City every four(4)years that the <br /> existing leachate transmission pipes do not leak. <br /> (02) Backup Leachate Pumps.Licensee shall maintain backup pumps for use in <br /> the event of pump failure at the leachate sump,wet well and/or leachate storage <br /> tank on-site. As an alternative,the licensee shall maintain provisions for restoring <br /> temporary leachate pumping within a 24-hour period and adhere to the current <br /> "Leachate Management Plan"as approved by MPCA. <br /> (03) Leachate Holding Tank.Licensee shall ensure that the leachate holding <br /> tank is pumped out on a regular schedule.It is a violation of this License to allow <br /> leachate to collect on the liner to a depth exceeding one foot due to the leachate <br /> holding tank being full. <br /> (04) Leachate Recirculation. The Licensee may conduct Leachate <br /> Recirculation pursuant to MPCA,County and City regulations. In the event that <br /> operational problems occur from the leachate recirculation,the Licensee shall <br /> immediately cease leachate recirculation and revert to prior method of leachate <br /> management unless and until another remedy for the problem is approved by the <br /> City. Leachate recirculation will greatly increase the amount of landfill gas that <br /> will be generated from the landfill. The primary concerns relate to landfill gas <br /> collection and the prevention of fugitive gas emissions and odors. <br /> (a) Temporary final cover is proposed as an element of the c° <br /> 2008March 2012"Leachate Recirculation Permit ^pphe,tio " <br /> 7 <br />