My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.10. PCSR 09-28-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2000-2005
>
2004
>
09-28-2004
>
5.10. PCSR 09-28-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2013 12:03:59 PM
Creation date
8/28/2013 11:54:55 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Medical Professional Building/Phoenix Enterprises <br /> September 22,2004 Page 2 <br /> on the Coborn's site. A cross access agreement for parking and accessing the <br /> trash enclosure will be necessary. <br /> • The trash enclosure will need to be designed to not let water into it, but allow <br /> surface water to continue to flow to the existing catch basin. <br /> • The curb and gutter lines shown for the existing site to the west, the Valvoline <br /> Oil site, do not appear to be correct. The driveway appears to be actually located <br /> further south in line with the sewer and water services. This needs to be <br /> connected. <br /> • Sidewalk pedestrian ramps will need to be constructed at the access off of the <br /> service road in accordance with the City standard plate number 2004. <br /> 2. Grading and Erosion Control Plan <br /> • The grading and erosion control plan needs to be revised to reflect the changes <br /> in the revised site plan. <br /> • Catch Basin #1 located northwest of the main building entrance is shown to <br /> have a rim elevation of 950.00. The catch basin forms a low point in the north <br /> portion of the parking lot. If the catch basin were to become plugged,there is <br /> no overland overflow route that would direct drainage away from the building. <br /> The parking lot grade should be revised to provide an emergency overflow, <br /> which will protect the building from flooding should the storm sewer catch basis <br /> become blocked. <br /> • The trash enclosure location is proposed in the route of the storm water <br /> overflow from the Cobom's parking lot. Additionally,the trash enclosure is <br /> shown to be constructed on top of an existing storm sewer line. The trash <br /> enclosure needs to be relocated to provide access for maintenance to the storm <br /> sewer line, and grading needs to indicate that the emergency overflow from the <br /> Coborn's parking lot will be maintained. <br /> • A six-foot high retaining wall is shown at the southeast corner of the proposed <br /> building. A building permit and an engineered design for this retaining wall will <br /> be necessary. <br /> • Because the site will disturb more than one acre of land, an NPDES construction <br /> permit will be required. As part of that permit, a Storm Water Pollution <br /> Prevention Plan (SWPPP)will be required to be submitted and approved. The <br /> City has prepared a generic SWPPP which can be signed by the developer and <br /> utilized for the project. <br /> • Relative to erosion and sediment control, special attention needs to be focused <br /> on preventing silt from entering the existing ponding area to the south. A <br /> retaining wall surrounds the pond which will be make removing silt from the <br /> pond very difficult. If the site construction does discharge silt and other erosion <br /> to the pond,the owner of the medical professional building development will be <br /> held responsible to remove it. <br /> • Spot elevations shown on the grading plans are in the 800's and the contours <br /> shown are in the 900's. <br /> S:\PLAND?ING\Case Files\2004\CU 04-27 Phoenix Entp\Engineer's memo 9-22-04.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.