My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 08-19-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
08-19-2013
>
8.2. SR 08-19-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2013 9:16:04 AM
Creation date
8/16/2013 9:14:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jason Wedel, PE <br /> Municipal Senior Project Manager <br /> SELECTED EXPERIENCE <br /> Bailey Lake Trunk Sanitary Sewer, Woodbury, MN <br /> Jason coordinated the study, design and construction of over two miles of <br /> trunk sanitary sewer. The City of Woodbury decided to open up their <br /> Phase II area of the City for new development which includes hundreds of <br /> acres of land that had been previously used for agricultural purposes. <br /> This required an EAW, land planning to establish potential development <br /> patterns, a feasibility report, easement acquisition, final plans, and <br /> construction management for a 27-inch trunk sanitary sewer main that <br /> ultimately connected to a Met Council interceptor and provided the <br /> sanitary sewer backbone for the entire area. Jason and other WSB staff <br /> worked with the City to review the proposed land uses for the area and <br /> created concepts on how this area would likely develop in the future. <br /> Final plans were then created and constructed based on the proposed <br /> alignment which required portions of the sanitary sewer to be <br /> constructed at depths exceeding fifty feet in some locations. <br /> Wayzata Boulevard Street Reconstruction, Wayzata, MN <br /> As Project Manager, Jason oversaw the reconstruction of Wayzata <br /> Boulevard from TH 12 to Superior Boulevard. This project involved <br /> reducing the width of the street, adding landscaped medians, and <br /> included bump outs at key pedestrian crossings. The result was a new <br /> street that was pedestrian friendly, aesthetically pleasing, and reduced <br /> the impervious surface by over an acre thereby reducing the storm water <br /> runoff directed to Lake Minnetonka. Construction is scheduled to begin <br /> in June of 2012. <br /> South Park Drive - Utility and Street Improvements, Savage, MN <br /> As City Engineer, Jason oversaw this one mile long State Aid project <br /> which was designed and contracted by in-house staff. It involved <br /> coordinating the construction with intersection signal improvements at <br /> TH 13, wetland impacts and mitigation as well as providing utility service <br /> for significant development along either side of the roadway including <br /> Super Target and a 166 unit townhome development. <br /> 150th Street - Utility and Street Improvements, Savage, MN <br /> As City Engineer, Jason oversaw the upgrade of an existing two lane rural <br /> roadway to a 52-foot wide urban street with trunk sanitary sewer and <br /> watermain improvements. This project required significant right-of-way <br /> acquisition as well as a number of neighborhood meetings with impacted <br /> property owners. The project also provided utility service and access to <br /> the new high school on the south side of the street. All design, contract <br /> administration, and right-of-way acquisition was completed in-house. <br /> A <br /> WSB <br />
The URL can be used to link to this page
Your browser does not support the video tag.