Laserfiche WebLink
The pipe in outlot B is 160 ft. in length.A 6 inch pipe of this length contains <br /> 235 gals of water.The estimated consumption for 3 buildings is 75gpd x <br /> 3units=225 gal. <br /> The water in the line will be replaced once every day for 3 units and twice per <br /> day for 6 units.Additionally each lot will have a lawn irrigation system <br /> supplied from the home. It would appear based on this calculation water <br /> quality should not be an issue.Tim Pomerleau discussed water quality with <br /> the home owners in the 3 units which are the only users on a 6 inch.They did <br /> not express any complaints about water quality. <br /> 4) Elk River Municipal Utilities recommends that the water main in outlot D be <br /> extended and connect to the water main running alongside the County Road, on the <br /> north boundary of the project to provide another feed into the development. This <br /> should have been part of the original improvements,but was neglected. <br /> The connection from outlot D to the county road was not made with the <br /> original development.At the time of construction of the 1"— Additions there was <br /> no water line in the CSAH 12 right of way. Has one been constructed since then? <br /> The private water system within the development does not require an additional <br /> connection to the public system for water quality or quantity. If the issue is more <br /> regional and necessary for the entire development (Klievers Lake 1"through 3' <br /> Additions) then the cost should be borne by all the development not just by 21 lots. <br /> Streets <br /> 5) All private drives should terminate in a barrier curb. <br /> Plan revised as noted. <br /> 6) A Homeowners association agreement(pursuant to Minnesota Statutes ch. 515A, <br /> article 2 for condominiums, or Minnesota Statutes ch. 515B, for townhome <br /> subdivisions)will need to be prepared to govern the maintenance of the common <br /> areas,private drives and utilities,prior to approval of the Final Plat. Please provide a <br /> copy of those documents for review by the City Attorney as soon as possible. <br /> A homeowners association will be created. <br /> Landscaping/Vegetation <br /> 7) Comments regarding the landscaping will be forthcoming.These comments will be based <br /> on the requirements of Section 30-994 g-4. <br /> R-3 residential versus Planned Unit Development zoning. <br /> 8) Staff supports the application to rezone to PUD to afford some flexibility from the strict <br /> setback requirements,with the understanding that the project remain generally consistent <br /> with R-3 zoning. The following comments are based on the review of Section 30-994: <br /> (2.a) Please provide materials and colors proposed for the project. Are all units the <br /> same? Please identify interior storage areas. <br /> (2.e) Please identify total square feet of the different building materials. <br /> (3b) Please verify that the garage area meets the 584 square foot storage area. <br />