My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 - 4.3 PCSR 06-11-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2013
>
06-11-2013
>
4.1 - 4.3 PCSR 06-11-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2013 10:01:28 AM
Creation date
6/7/2013 8:47:16 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/11/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(g) guest parking will need to be provided at a rate of 1 space per two dwelling units. <br /> The builder will furnish additional architectural information. Eleven guest <br /> parking stalls have been added to the plan <br /> Centerpoint Energy <br /> 9) Counterpoint Energy has expressed concern over the proposed vacation of the easement <br /> the throughout the Lot 49,Block 1. Based on the previous approval,they have installed <br /> utilities in these areas. Please correspond with Centerpoint to ensure that they are <br /> comfortable with the easement vacation and their concerns are addressed. Their comment <br /> letter, along with corresponding exhibits is attached. <br /> Centerpoint has been contacted. The easement vacation that they are concerned <br /> about will be recreated with the final plat. It is anticipated that the vacation and the <br /> final plat would be filed at the same time. <br /> If you have any questions or require further information,please call me at 651-251-0630. <br /> Sincerely, <br /> PIONEER ENGINE ' NG P.A. <br /> Z <br /> 7 <br /> Pauli. Che --,P.E. <br /> Cc: Tim Pomerleau Meadow Creek Builders <br />
The URL can be used to link to this page
Your browser does not support the video tag.