Laserfiche WebLink
Proposed Project Team and Experience <br /> In summary,we strive to provide the best team services possible,with the team specifically tailored to meet the needs <br /> of the City of Elk River. The organizational chart below illustrates personnel associated with individual tasks.A brief <br /> summary of key staff members follows the organizational chart. Resumes of the key staff members are included in <br /> Appendix A of this proposal. <br /> City of Elk River <br /> Justin Fernrite, P.E. <br /> City Engineer <br /> Bradley DeWolf, P.E. <br /> Principal-in-Charge <br /> Seth A. Peterson, P.E. <br /> Project Manager/Project Engineer <br /> Quality Control/ Project Design Team Construction Services Operations Support <br /> Project Review Staff <br /> Greg Sindt, P.E. Herman Dharmarajah, R. Kelly Yahnke R. Kelly Yahnke <br /> Quality Control/Project Review Ph.D.,P.E. Design Review/Construction Engineer Design Review/Construction Engineer <br /> Robert Brown, P.E. Process Design Technical Support&QA/QC Kirk Yahnke Kirk Yahnke <br /> Quality Control/Project Review Paul Saffert, P.E. Construction Observer Wastewater Operator <br /> Senior Design Engineer Tejpal Bala,P.E. Ron Quade <br /> Tejpal Bala,P.E. Construction Observation Wastewater Operator <br /> Design Engineer Chuck DeWolf,Sr. <br /> Sheldon Sorensen,P.E. Wastewater Operator <br /> Electrical&Controls Systems <br /> William Lehnertz, P.E. <br /> Structural Engineering Services <br /> Jeff Rapp,AIA, CID <br /> Architectural Services <br /> Tom Wentz,P.E. <br /> Mechanical Design Services <br /> Neil Schuette <br /> Senior Design Technician <br /> Wastewater Treatment Facility Improvements I City of Elk River, Minnesota 2 <br />