Laserfiche WebLink
10) On sheet C2, I note 10 posts set into the sides€alk along dze front of the building. ~X1iat <br />is die purpose for these' The plans suggest a curb along the front of the building. The same <br />situation exists on the south side of the building, «-id1 no posts. <br />11) On sheet ~-2, show the location of d1e mechanical units. They- must be screened from <br />the public streets. <br />Ever- attempt ~;-as made to prepare complete, dzorough comments; ho«-ever, the Citt- <br />resei-~-es the right to comment on any- subsequent information pro~-ided, or on anj items <br />rising to our attention. <br />It is helpful to generate a point by point response letter to these comments as part of jour <br />newt submittal. That wad-, focus can be directed to comments that require additional <br />discussion, reducing time necessai-~- for staff review. <br />The point by point letter and revised dra~-ings should be pro~-ided by June 1`''. The revised <br />submittal should include tw°o full size sets as well as one 1117 reduced sets for the Planning <br />Commission review. Please also provide a .pdf cope of any revised graphics. You mad- email <br />this copy. <br />Please do not hesitate to contact me should ~-ou have any questions, I can be reached at <br />(763) 635-1034. <br />Sincerely, <br />.~ <br />J remy Barnhart <br />Planning Manager, AICP <br />Cc: Rafael Brassi via email (ceieng.com) <br />Bob Ruprecht, Building Official <br />Rebecca Haug, Environmental tldministrator <br />Justin Femrite, City Engineer <br />Phone: 763.635.1000 <br />Fax: 763.635.1090 <br />www.ci.elk-river.mn.us <br />