My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 PCSR 06-12-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
06-12-2012
>
4.5 PCSR 06-12-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2012 11:15:37 AM
Creation date
6/7/2012 2:27:50 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/12/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ ~~,y <br />f ...J' c:~,~, <br />k, <br />June 4, 2012 <br />Mr. Jeremy Barnhart, AICP <br />Planning Manager <br />City of Elk River <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />ENGINEERS ^ SURVEYORS ^ PLANNERS <br />LANDSCAPE ARCHITECTS ^ ENVIRONMENTAL SCIENTISTS <br />2277 West Highway 36, Suite 200 <br />Roseville, MN 55113 <br />(651) 697-0800 Fax (651 } 697-0804 <br />www.ceieng.com <br />RE: 27128.0 - AutoZone, Zane St., NW <br />Site Plan Submittal <br />Dear Jeremy: <br />Thank you for your review of the referenced project. We offer the following responses to your <br />comments: <br />Timetable: <br />1. This project will require a public hearing of the site plan. These hearings are anticipated <br />for June 12th (Planning Commission) and June 18th (City Council). Both meetings start <br />at 6:30 PM and are held at the Elk River City Hall. You or an agent must attend these <br />meetings.. <br />Response: We acknowledge the public hearing requirements for both Planning <br />Commission and City Council, and will attend both meetings. <br />Building Inspection: <br />2. Site Plan approval merely gives the City the ability to issue a building permit. Please <br />correspond with Bob Ruprecht, Building Official for the building permit. He can be <br />reached at (763)635-1066. <br />Response: We will contact Mr. Ruprecht for Building Permit processing. <br />Engineering: <br />3. The City Engineer has reviewed the drawings and has suggested the following changes, <br />based on the sheet: <br />a. Page C3 -Storm Manhole #1 shall be detailed and constructed per Elk River <br />Standard Plate #4001. <br />Response: The requested Standard Plate has been added to the plans on <br />Detail Sheet C10. <br />Providing Consolidated Land Development Services <br />GALIFt)RMA ^ TEXAS ^ ARKANSAS ^ MINNESOTA ^ GEORGIA ^ PENNSY!_VANIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.