My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 11-10-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
11/10/2003
>
5.3. SR 11-10-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:13 AM
Creation date
11/13/2003 8:07:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/10/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November t~ 2003 <br /> <br />STEVENS <br /> <br />ENGINEERS <br /> <br />Mayor and City Council Members <br />City of Elk .River <br />13065 Orono Pkwy <br />Elk River, MN 55330-5600 <br /> <br />RE: <br /> <br />Ice Rink Floor Replacement Project - Bid Results <br />Our File No. 6008 <br /> <br />Dear Mayor and City Council Members: <br /> <br />On Thursday, October 30, 2003 bids were opened for the ice Rink Flooi- Replacement Project. The Iow <br />bid was $253,097 submitted by Commercial Refrigeration Systems located in Virginia, Minnesota. There <br />was a lot of interest in the project but in the end only two c~ntmctors submitted beds on the project. The <br />bid are summarized below along with the engineer's estimate. <br /> <br />Bidder ..... Base Bid Alternate 1' ' i Ailemat~"~ Altemate 3 <br />"Commerci;,iR~.dgeration.Systerns $253,097.00 $0.00 $,!5,815.00 <br />Rochon Corp0..ration : '$352,.385..00 ($1..4_,010.00)$40,298.00 $28,52.1.{~0 <br />Engineer's Estimate $2.49.~500.00 .~'0.0O .. $45,000.~.00 $25~000.00 <br /> <br />Alternate Bid 1 - Change project schedule to May 5, 2004 through August 23, 2004 <br />Alternate 'Bid 2 - .Demolition of rink floor and perimeter slab <br />Altemate Bid 3 - Install sub-floor heating system pipe grid <br /> <br />The spread between the two bids is n°t surprising. Commercial Refrigeration Systems specializes in <br />repairing direct refrigeration systems and will do most of the work themselves. Rochon Corporation. is <br />inexperienced at constructing ice rink floors and would give most of the wo~ to subcontractors. The Iow <br />bid compares favorably with the engineers estimate. The engineer's estimate was prepared prior to <br />opening the bids and is based on final plans. <br /> <br />We have reviewed the bids and recommend awarding the contract to the Iow bidder Commercial <br />Refrigeration Systems on the condition that the contractor' wilE. execute the contract documents and .' <br />return them to the City within ten (10) days in conformance with the blclcling documents. <br /> <br />Since it is still unknown whether the repairs to the existing ice fink floor will be successful, the options <br />for awarding the contract are summarize(] below. <br /> <br /> 1656 LJvingstorte Road * Hudson, WI ,54016 <br />7715-366-5819 - 651-436-2075 * 800-822-7670 · fax: 715-386-5879 · wWw. Stevensengineers.com <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.