My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 11-10-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
11/10/2003
>
5.3. SR 11-10-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:13 AM
Creation date
11/13/2003 8:07:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/10/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the process of repairing the equipment for this year's start up, we came across some <br />valves that are in need of replacement. The valves in question isolate the low-pressure <br />receiver that stores the refrigeration in it. If one of these vales fails, we would not be able <br />to make repairs to the system without evacuating the system, which is very expensive. <br />This summer, during construction, the low-pressure receiver will be evacuated to work on <br />the project. This would be an idea time to replace these worn out valves with new ones. <br />The cost of replacing these valves is estimated to be about $10,000.00 and could be added <br />to the prQect as a change order or could be billed separately from the project. Either way <br />changing these valves when the low-pressure receiver is evacuated for the project would <br />save us thousands of dollars and could possibly save us some headaches down the road. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.