My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. SR 11-10-2003
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2003
>
11/10/2003
>
5.3. SR 11-10-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:13 AM
Creation date
11/13/2003 8:07:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/10/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ARENA <br />1000 SCHOOL STREET N.W. <br />ELK RIVER, MN 55330 <br />(763) 635- 1141 <br /> Fax (763) 635 - 1144 <br /> <br />To: Elk River Mayor and City Council <br />From: Rich Czech, Arena Manager <br /> <br />Date: November 10, 2003 <br /> <br />Subject: Barn Floor Update / Barn Floor Replacement / Dasher Board Bids <br /> <br />Great News! On Saturday November 8th the first group of skaters skated on the Barn for <br />the 2003 - 2004 season. Time will tell how much refrigeration we will have to add during <br />the season and if any other pipes will burst throughout the year. The likelihood of a pipe <br />in the floor bursting is unlikely, however I want the Council to be aware of the possibility. <br /> <br />Scott Ward of Stevens Engineers has submitted the bid information and their <br />recommendation for the replacement of the Barn's floor and the new dasher boards. <br />(Attached is his memo to the Mayor and City Council.) Scott has been very helpful while <br />we worked through this process and is very knowledgeable about this type of <br />construction. <br /> <br />It is my recommendation that the Council awards the base bid along with option 2 B <br />alternate (one) 1 and (two) 2 to Commercial Refrigeration as recommended by Scott. <br /> <br />Altemate (three) 3 is for a sub floor heat grid if the rink was to be operated year round. <br />Without sub floor heating, the Barn can only operate eight continuous months in one <br />season before the ice would have to be removed. There would be other components that <br />would have to be purchased in order to have ice in the Barn year round. I do not see the <br />Barn operating year round in the future and do not recommend the sub floor heat grid. <br />The total cost of Option 2B without alternate 3 would be $298,912.00. <br /> <br />I also agree with Scott, that the bid for the dasher boards should be awarded to <br />Commercial Refrigeration. Commercial Refrigeration will subcontract Becker Arena <br />Products to build and install the boards. Becker Arena Products is known for quality <br />products throughout the United States. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.