Laserfiche WebLink
Option 2 (Minimal Capital Repairs): <br />• Repair roof system in rink 1 including new roof membrane on Rink 1. <br />• Repair flat roof area between existing rinks, numerous leaks. <br />• Remove existing spray insulation from main steel frames and paint. <br />• Add Low -E ceiling. <br />• Repair existing steel framing based on inspection after spray insulation is removed. <br />• Add refrigeration room ventilation to Rink 1. <br />• Add ice resurfacer room ventilation to Rink 1. <br />• Replace radiant heating over bleachers. <br />• Add ventilation and make -up air to existing Rink 1 Team <br />• Add Dehumidification to Rink 1. <br />• Repair Rink 2 Dehumidification. <br />• Provide minimum improvements to Rink 2 Refrigeration; <br />and vessel integrity investigation. <br />Rooms. <br />limited to new compressors, motors, <br />Pros: <br />Minimal cost outlay to maintain Community asset. <br />Fixes dehumidification problem in Rink 1, helping to maintain the integrity of the steel structure. <br />Fixes roof leaks on Rink 1, helping to maintain the integrity of the steel structure. <br />Cons: <br />Expense <br />Energy efficiency of building is not improved. Insulation and waste heat recovery are not utilized. <br />Refrigeration issues on Rink 2 are not addressed. <br />Rink 2 refrigerated floor is still sand based. <br />Main components of 30 year old refrigeration systems are still being used. <br />Environmentally harmful refrigerants are still in use. <br />a <br />Z <br />W <br />a <br />W <br />v <br />W <br />Y <br />J <br />W <br />Q <br />i <br />N <br />61 <br />N <br />No operational improvements to facility, still maintaining two refrigeration and ice resurfacer rooms. <br />Team rooms for High School are not addressed. - <br />Non - regulation size of Rink 1 ice sheet is also not addressed. <br />ADA issues not addressed. <br />