Laserfiche WebLink
VµarhA V!. Hti. vwsrty _. <br />11 Q <br />G. <br />i <br />i <br />e o a p � • — <br />( <br />(figure skate/ <br />2 I party rooms) Q <br />� N <br />O G D C N <br />--------- - - - - -- - - -- --- - - - - -- <br />Ice <br />rr�sur{,un1/ �I III hn. II~B I �.,srhlV I� i'vro», II �ra,.•,'i. rowll ,n, t. <br />4. <br />n <br />a <br />o <br />—u, <br />a <br />a <br />e 41.+ <br />o <br />0 <br />0 <br />Aim.. <br />G. Sfn' <br />N�• <br />r^lk _ <br />i <br />J <br />Pros: W <br />New refrigeration plant sized and ready to add Rink 1 refrigeration. <br />Operationally more efficient; combined ice resurfacer and refrigeration room. <br />Concrete floor added to Rink 2, multi - purpose opportunities are possible and less maintenance and o <br />more efficient operation of ice plant. to <br />More energy efficient facility; insulated walls and roof for rink 1, efficient HVAC and dehumidification <br />systems. cu <br />Facility will have a new identity because of lobby expansion. �j <br />Larger lobby accommodates larger events. <br />Varsity Team rooms are addressed. <br />Cons: - <br />Expense <br />41 year old Rink 1 structure is being utilized. <br />Alternate: Reduce Rink 2 from Olympic size to NHL size <br />football <br />storage. <br />maint. <br />o a a ie az <br />O <br />(Renovation Plus): _ -- <br />N <br />• Same upgrades as #2 <br />• New refrigeration (concrete floor) and refrigeration room for Rink 2, size and prep to add Rink <br />LU <br />1 in the future <br />- <br />• Add varsity locker rooms to Rink 2 <br />• Renovate existing refrigeration and resurfacer room into new resurfacer room with internal large <br />snow melt pit. <br />• Add sprinklers over Rink 2 Ice arena floor surface. <br />a <br />• Upgrade IT and PA systems <br />Z <br />Uj <br />• Add maintenance room to west side of Rink 1 <br />• New front lobby addition including team rooms, concessions, pro -shop, restrooms, manager's <br />a <br />office. <br />Uj <br />U <br />v <br />• Create "shell" space for dryland training facility above new varsity locker rooms. <br />• New exterior insulated wall and roof panels on Rink 1. <br />W <br />• Add football storage and ice arena maintenance storage to Rink 1. <br />• Add elevator (alternate) <br />J <br />Pros: W <br />New refrigeration plant sized and ready to add Rink 1 refrigeration. <br />Operationally more efficient; combined ice resurfacer and refrigeration room. <br />Concrete floor added to Rink 2, multi - purpose opportunities are possible and less maintenance and o <br />more efficient operation of ice plant. to <br />More energy efficient facility; insulated walls and roof for rink 1, efficient HVAC and dehumidification <br />systems. cu <br />Facility will have a new identity because of lobby expansion. �j <br />Larger lobby accommodates larger events. <br />Varsity Team rooms are addressed. <br />Cons: - <br />Expense <br />41 year old Rink 1 structure is being utilized. <br />Alternate: Reduce Rink 2 from Olympic size to NHL size <br />