Laserfiche WebLink
Option 1 (Leave existing facility as is): <br />• Estimate another 9 -12 years until structure will require significant repairs to remain in use <br />• Rink 2 refrigeration system is past its expected life expectancy. <br />• Rink 2 requires repairs to dehumidification system. <br />• Rink 1 refrigeration system is past its expected life expectancy (floor is in good condition). <br />• Rink 1 has no dehumidification system, and life safety systems in refrigeration room are <br />non - existent. <br />• Locker rooms are not properly ventilated. <br />• Numerous roof leaks on Rink 1, causing extensive deteriation of building structure. <br />Pros: <br />No cost <br />Cons: <br />Potential safety hazards regarding ventilation and life safety systems. <br />Maintenance costs will be unpredictable from year to year. <br />Roof leaks are causing further deterioration of structure. <br />No dehumidification causes further deterioration of structure and poor indoor <br />air quality environment. <br />Customers and citizens lose interest and stop utilizing the facility. <br />City loses value on a significant community investment. <br />ADA issues not addressed. <br />a <br />Z <br />W <br />a <br />W <br />W <br />Y <br />J <br />W <br />Q <br />i <br />.V) <br />r) <br />N <br />61 <br />N <br />