My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. ICESR 03-13-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2012
>
03-13-2012
>
4.0. ICESR 03-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2012 11:12:59 AM
Creation date
3/21/2012 3:50:13 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
3/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />Stevens <br />An evaluation of your ice system can provide valuable information in assessing the condition of the facility's <br />systems and assisting in planning facility improvements. More specifically, the information can be used to: identify <br />the needed improvements to the facility; develop a scope of work; and generate cost estimates to use for <br />budgeting. Stevens will provide a step by step approach to the evaluation as described below: <br />Step 1-Collect /niormation on Ice Systems: <br />Meeting #1: Meet with you and other interested parties tc; <br />• Perform on-site investigation of the ice system. <br />• Walk through the facility with you and the facility's staff. <br />• Collect information on the systems. <br />• Discuss history of problems with the ice system. <br />• Discuss desired improvements to the ice system. <br />• Obtain copies of the following information: <br />o Record plans for the facility. <br />o Shopdrawings of ice equipment, ice systems and other mechanical systems, <br />o Daily logs on the ice system operation. <br />o Records or information on any improvements that have been performed on the facility or its <br />mechanical systems. <br />o Sdil information from original building construction and floor replacement in 2004. <br />Step 2-Develop Improvement Plan (Analysis and Evaluation) <br />During this step we will: <br />• Evaluate the information we gathered during the site visit in Step 1. <br />• Evaluate any additional information provided to us by you. <br />• Evaluate the existing soils information, <br />• Identify problem areas, areas of concern or areas for improvements to the ice and mechanical systems, <br />• Summarize the information in a letter report including and discussing the following: <br />o Description of existing ice systems. <br />o Information collected during the site visit. <br />o Evaluation of existing ice system. <br />o Recommendations for system improvements, modifications and/or replacement. <br />o Estimate of probable construction costs and project costs for recommended improvements. <br />o Five (5) copies of the draft report. <br />• Meeting #2: Teleconference with you and other interested parties to review a draft of the report. We can <br />meet with you in person if needed. The cost of this meeting would be in addition to the fee provided in <br />this proposal. <br />• Incorporate changes and comments that were discussed at the meeting into the report and finalize. <br />• Provide ten (10) copies of the final report. <br />• Present the plan. We can. meet with you and other interested parties to present the final plan if needed. <br />The cast of this meeting would be in addition to the fee provided in this proposal. <br />Mr. Rich Czech <br />March 8, 2012 Page 2 of 4 <br />2211'©`NeMfto'atl, Hudson, WI 54016 t 715.386.5819 t 651.436.2075 f 715.386.5879 wwwstevensengineers:com <br />
The URL can be used to link to this page
Your browser does not support the video tag.