Laserfiche WebLink
Steve n s <br />March 8, 2012 <br />Mr. Rich Czech <br />Elk River Ice Arena <br />1000 School Street N.W. <br />Elk River,MN 55330 <br />Re: Professional Engineering and Consulting Services REVISED Proposal <br />Elk River Ice Arena -Rink 1 Ice System Evaluation <br />Our Project No. 900-11-159 <br />Dear Mr. Czech: <br />We are pleased to offer our services to perform a brief evaluation of the existing ice system in the original rink <br />(Rink 1 or "the barn") at the Elk River Ice Arena Facility. As you know, we have the in-depth, specialty experience, <br />especially in the evaluation renovation and conversion of direct Holmsten Ice Rink Systems, required to <br />successfully complete this project for you and the City of Elk River. We are also very familiar with your facility <br />after designing the ice rink floor and dasher board replacement in Rink 1 of the facility in 2004. <br />PROJECT UNDERSTANDING <br />The Elk River Ice Arena consists of two (2) ice arenas where both ice rinks are served by individual Holmstein <br />direct R-22 refrigeration systems. The refrigeration system serving the original rink (Rink 1) has a capacity of SO <br />tons and the system for the new rink (Rink 2) has capacity of 135 tons. The ice rink floor and dasher board <br />systems were replaced in Rink 1 in 2004. <br />Due to the age of the Rink 1, the City is interested in completing an evaluation of ice system (rink floor and <br />refrigeration system) to determine the condition and to identify and recommend improvements and/or <br />replacement options to assist in future planning for the facility. The evaluation should also include estimated <br />project costs for the improvements. The HVAC, electrical, lighting and building systems will not be part of this <br />evaluation and is being evaluated by other consultants. <br />Mr. Rich Czech <br />March 8, 2012 <br />2211 D'Neir ROatl, Hudson, W1 54016 t 715.356.5819 t651.436.2075 f 715.386.5879 wwwstevensengineers.com <br />