My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3 PCSR 03-13-2012
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2012
>
03-13-2012
>
4.3 PCSR 03-13-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2012 9:44:39 AM
Creation date
3/9/2012 9:17:35 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2) There appears to be a storm sewer, at least at the NE corner of the building <br />that is not shown on the plans. Is this to be abandoned? <br />NOTES DETAILING THE ABANDONMENT OF THE EXISTING STORM <br />SEWER AT THE NORTHEAST CORNER OF THE BUILDING HAVE <br />BEEN ADDED TO THE PLANS. SEE REVISED SHEET C-4. <br />Wild and Scenic and Shoreland Regulations <br />3) This project is located adjacent to wild and scenic designated lands. I note <br />that no changes to these areas are proposed. <br />4) This property is within the jurisdiction of the Shoreland overlay district, which <br />addresses impervious surface and setbacks to the river. There are no increases <br />to the setbacks proposed, however, there is proposed and increase to the <br />pervious surface. Please provide calculations of the impervious surface of the <br />lot, pre and post construction. If the amount is greater than 25% of the lot area, <br />which appears likely, a stormwater drainage plan will need to be prepared, to <br />restrict the developed five year frequency discharge to a rage not greater than <br />the discharge with no development. City Staff can help you with development of <br />this plan. Please contact Nicki Blake-Bradley for assistance. <br />CALCULATIONS OF THE IMPERVIOUS SURFACE PRE AND POST <br />CONSTRUCTION HAVE BEEN MADE AND WILL BE SUBMITTED. THE <br />SITE IS OVER 25 PERCENT IMPERVIOUS, SO A STORMWATER <br />PLAN WILL BE REQUIRED TO ADDRESS THE POST DEVELOPMENT <br />5 YEAR RUNOFF. THE APPLICANT WILL WORK WITH CITY STAFF <br />TO DEVELOP THIS PLAN. <br />Historic Preservation <br />5) Most properties adjacent to the Mississippi River have greater than normal <br />potential for the finding of artifacts relating to the history and prehistory of the <br />area. It is common that the Council adds a condition to the effect that a <br />developer finding any evidence of these artifacts during construction will report <br />such findings to the City immediately. <br />ANY AND ALL DISCOVERED ARTIFACTS RELATING TO THE <br />HISTORY AND PREHISTORY OF THE AREA WILL BE REPORTED TO <br />THE CITY IMMEDIATELY. <br />VANMAN ARCHITECTS AND BUILDERS INC. <br />669 Winnetka Avenue North • Suite 210 • Minneapolis, Minnesota 55427 <br />888.327.2817 • 763.541,9552 • fax 763.541.9857 <br />www.vanmanab.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.