My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2.-5.4. PCSR 09-13-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
09-13-2011
>
5.2.-5.4. PCSR 09-13-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2011 2:18:23 PM
Creation date
9/8/2011 2:35:20 PM
Metadata
Fields
Template:
City Government
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 5 <br />Land Use Amendment <br />5.1 LAND USE AMENDMENT NARRATIVE <br />The SDA is guided "Mining" on the land use plan. The Land Use Amendment application form <br />requires a typewritten narrative that provides the information below. <br />^ Detailed description/scope of project - what is being proposed <br />See Section 1.2 for a complete description of the proposed project. <br />^ What are the reasons/purposes for the proposed Land Use Change? What has changed to <br />warrant the Land Use Change? <br />ERL believes that the expanded Landfill does not require a Land Use Change and that the <br />expansion is consistent with the Plan. Nonetheless, at City's request, ERL seeks such a Land Use <br />Change. The SDA is guided "Mining" on the Plan and current mining operations will continue. <br />The EIS found that "the proposed project is compatible with the existing and future land uses in <br />the project area" (pg. 4). The SDA is guided for "mining," which is an industrial use, and <br />"landfilling" is, per the EIS, an industrial use. <br />How is the request consistent with the City of E/k River Comprehensive Plan? <br />The Plan contains the following text within its vision statement, °As Energy City, Elk River seeks <br />to promote sustainable and energy efficient forms of developments" (pg. 2-2). The expanded <br />Landfill provides the opportunity for additional green energy generation capacity. <br />A 8.9-acre portion of the expanded Landfill is located within ERL's existing 137.4-acre landfill <br />property, which is guided "Landfill" in the land use plan. The Plan states that the "Landfill use is <br />consistent with the current land use plan" (pg. 5-13). <br />The SDA is guided "Mining" in the land use plan. The Plan states that the "Mining land use <br />designation functions similar to the Urban Reserve. The primary objective of this land use <br />category is to allow the current mining use of the land and address future land use when <br />development becomes imminent" (pg. 5-13). The "Mining" designation is consistent with this <br />request as mining will continue to occur within the SDA. According to the Plan, City anticipated <br />that it could achieve its growth projections between 2025 and 2032. The Plan did not attribute <br />any job or population growth to the Mining land use areas (pg. 4-9). This suggests that <br />development of the SDA is not imminent until after 2025- 2032, which is compatible with the <br />anticipated development schedule for the SDA (see Table 1 in Section 1.2 of this application). <br />The Plan states that the discussions at the Comprehensive Plan Task Force meetings and public <br />meetings has been to guide the future development of the "Mining" area toward a combination of <br />Commercial and Industrial uses close to existing and proposed roadway infrastructure (pg. 5-13). <br />The SDA is consistent with these discussions as it provides for Industrial uses associated with <br />mining and landfilling and provides the opportunity for Commercial end uses adjacent to major <br />roadway infrastructure. <br />Elk River Landfill SDA ~ Section 5-1 <br />Land Use Application - 1~fenCl< <br />ELK RIVEK LLN6i1L <br />
The URL can be used to link to this page
Your browser does not support the video tag.