My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2.-5.4. PCSR 09-13-2011
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2011
>
09-13-2011
>
5.2.-5.4. PCSR 09-13-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2011 2:18:23 PM
Creation date
9/8/2011 2:35:20 PM
Metadata
Fields
Template:
City Government
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Service. Adequate electrical service is provided at the site for operations and <br />repairs. The expanded Landfill will generate electricity at the landfill gas to energy <br />facility. <br />(5) Will not invo/ve uses, activities, processes, materials, equipment and conditions of operation <br />that will be detrimental to any persons or property because of excessive traffic, noise, smoke, <br />fumes, g/are, odors, dust or vibrations. <br />Traffic. The expanded Landfill will not generate excessive traffic. Traffic issues were addressed in <br />the Scoping EAW for the initially-proposed 73.4-acre expanded Landfill. No additional traffic <br />is expected to be generated by the operations. The Scoping EAW concluded that since the <br />overall operation of the initially-proposed 73.4-acre expanded Landfill is not anticipated to <br />include significant increases in waste flow over the current operation, effects on traffic <br />congestion would be expected to be minimal. <br />Noise. No additional operating noise is expected to be generated by the 27.2-acre expanded <br />Landfill. As is currently the practice, noise will be minimized through the following: <br />All equipment and vehicles utilized at the landfill site will be periodically inspected and <br />maintained to minimize noise. <br />Applicable state standards for noise pollution will not be exceeded by the landfill <br />operation, equipment, vehicles, or machinery. <br />Smoke. The expanded Landfill will not generate smoke. <br />Fumes. See Odor discussion in the statements regarding CUP finding number 1. <br />Glare. The expanded Landfill will not utilize lighting that will create glare or light trespass issues. <br />Odors. See Odor discussion in the statements regarding CUP finding number 1. <br />Dust. Fugitive dust emissions off-site will be controlled at the landfill site as necessary by <br />undertaking the following and in accordance with the facility's Fugitive Emissions Control <br />Plan: <br />ERL staff regularly checks for dust and other fugitive emissions in accordance with the <br />Fugitive Emissions Control Plan. <br />Road surfaces within the landfill site will be wetted with water or an appropriate chemical <br />whenever off-site dust levels become unreasonable as determined by the <br />Environmental Administrator. <br />Dust pollutives will be utilized to the extent necessary on cover material such as <br />stockpiles to reduce wind erosion as well as on other exposed surfaces as <br />appropriate. <br />Cover compaction and revegetation activities will be undertaken promptly on the <br />completion of various fill areas and vegetative cover capable of quick growth will be <br />utilized. <br />Vibration. See response to noise above. <br />(6) Will not result in the destruction, loss or damage of a natural, scenic or historic feature of <br />major importance. <br />r'" <br />ti, <br />Elk River Landfill SDA _ ~ - Section 4-8 <br />Land Use Application '" WE'nC1~ <br />E~Ka„E. ~,,,.a~~~. <br />
The URL can be used to link to this page
Your browser does not support the video tag.