Laserfiche WebLink
3.02 DISPOSAL OF MATERIALS AND DEBRIS <br />A. CONTRACTOR shall remove and dispose of any debris, such as, but not limited to: tires, <br />vehicles, junk, garbage, wood, railroad ties and rails, power poles, trees and shrubs necessary <br />to facilitate demolition, and building residue. <br />B. CONTRACTOR shall remove all solid waste from buildings and dispose prior to demolition, <br />such as, but not limited to: paper, furniture, and appliances as discussed in Section 02110. <br />3.03 DEMOLITION <br />A. CONTRACTOR shall demolish all buildings, rooms, structures, and appurtenances located <br />on the Property. Any partial demolition of a building or structure shall be performed in a <br />manner that maintains the structural stability of those portions of the building or structure that <br />are not ready for demolition. <br />B. Demolitions shall include, but are not limited to, all roofs, floors, walls, slabs, sidewalks, and <br />door stoops to a maximum elevation of basement floor elevation and/or existing grade. <br />C. All bituminous pavements shall be demolished .and disposed off-site or recycled off-site. <br />D. CONTRACTOR shall furnish any shoring or bracing required for support of walls during <br />demolition, if necessary.. <br />E. All demolition shall be conducted such that the generation of dust is absolutely minimized. <br />Generation of fugitive dust shall be prohibited. Generous application of water streams} <br />during demolition is one method that may accomplish this requirement. CONTRACTOR <br />shall modify means and methods of demolition to further reduce dust generation whenever, in <br />the opinion of the CITY, or representative of regulatory authority, the demolition activities <br />are generating excessive dust. <br />F. The CONTRACTOR may use any method for .demolition, except blasting, as <br />CONTRACTOR deems most practicable considering all applicable factors and requirements. <br />G. CONTRACTOR shall conduct all demolition activities such as to prevent damage to .all <br />adjacent real and personal property. <br />3.05 SALVAGE <br />A. CONTRACTOR shall salvage all metal scrap and other salvageable materials from the <br />demolition materials. Salvageable materials shall include those materials that are recyclable. <br />Load and transport all salvageable materials. CONTRACTOR shall pay all costs or receive all <br />proceeds that may result from salvage of metal scrap and other salvageable materials including <br />floor plates and grates. <br />B. CONTRACTOR shall submit copies of all load tickets, receipts, or other acceptable evidence <br />for the disposal of all salvageable materials. <br />C. CONTRACTOR shall pay. all transportation costs and other charges, tipping fees, and costs <br />associated with recycling of salvageable materials. <br />3.06 DISPOSAL <br />C:\Users\jbarnhart\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.0utlook\C1 P8X2PD\Eagles demo.doc <br />