Laserfiche WebLink
and Wilson Street intersection will experience approach delays with scenario 2 or 3. The ' <br />delays are strictly the result of the interchange operation and would be eliminated with a <br />higher capacity interchange. The Twin Lakes Parkway at 171St Lane intersection will <br />experience some delays for the eastbound and westbound minor street approaches with ' <br />scenario 3 during the PM peak hour. However, the overall intersection LOS is still at a B. <br />All other study area intersections would be operating at LOS C or better during both the AM ' <br />and PM peak hours for all three scenarios. <br />City of Elk River <br />Draf[ Alternative Urban Areawide Review , <br />July 2011 Page 8 of 84 <br />