My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3. SR 01-21-1997
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1997
>
01/21/1997
>
9.3. SR 01-21-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:32:44 AM
Creation date
7/24/2003 6:59:50 PM
Metadata
Fields
Template:
City Government
type
SR
date
1/21/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUDGET,011097 Concept <br /> <br />16 Lighting, upper level <br />16 Lighting, lower level, strip fluorescent <br />16 Lighting, exterior, building mounted <br />16 Power, general <br />16 Power, equipment <br />16 Communication, raceway <br />16 Electric ramp heater <br /> <br />8 Doors, frames & finish hdwe - exterior <br />8 Doors, frames & finish hdwe- interior <br />8 Hollow metal windows <br /> <br />7 Roof access hatch <br />7 Metal @ top ofwall <br />7 Roof insulation, v.barrier & membrane <br /> <br />8 Aluminum door hardware & operators <br />8 Aluminum storefront & windows <br />8 Glass & glazing, interior <br /> <br />6 Rough carpentry-roof & wall blocking <br />6 Rough carpentry-roof plywood <br />6 Casework <br />6 Fire extinguishers <br />6 Install doors & hardware <br />6 Toilet accessories <br />6 Sealant, masonry control joints <br /> <br />7 Roofing, metal roofing & flashing <br /> <br />5 Light gage metal framing <br />9 Install frames @drywall <br />9 Drywall & framing <br />9 Drywall & framing @ vestibule ceiling <br />9 Ceiling, acoustical <br />9 Furring & gyp board @ exterior wall <br /> <br />$ 62,000 <br /> <br />$ 8,550 <br /> <br />$ 21,735 <br /> <br />$ 37,316 <br /> <br />$ 32,175 <br /> <br />$ 30,713 <br /> <br />9 Exterior wall insulation & vapor barder $ 35,652 <br />7 EIFS & sealants $ 22,850 <br /> <br />9 Concrete floor sealer <br />9 Floor coating @ cooler, epoxy urethane <br />9 Exterior painting <br />9 Paint, interior walls <br /> <br />9 Paint,deck & joist <br /> <br /> $ 13,500 <br /> 9 Carpet & base - $25 / cy allowance $ 13,344 <br /> <br /> 9 Vinyl tile & vinyl base $ <br /> 9 Hard tile @ toilets <br /> 6 Entry mat <br /> <br /> 9 Hard tile @ vestibule $ 4,820 <br /> 2 Landscaping $ 16,230 <br /> 2 Irrigation $ 5,800 <br /> <br />10 Dock shelter <br />10 Dock leveler <br />10 Dock curtain & pads $ 10,600 <br /> <br />10 Overhead doors, 2 each $ 3,000 <br /> Hydraulic elevator, standard cab $ 28,000 <br /> <br />NEW ELK RIVER MUNICIPAL LIQUOR STORE Greystone Construction Co. Page 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.