Laserfiche WebLink
Phase fi Preliminary Cost Estimate <br />Item Qescri Lion Uni# Q# . Unit Cost Total +Cos# <br /> <br />SfTE WQRit ~ 25,500.00 <br /> Mobilization LS 1 $ i 7,000.00 $ 17,000.00 <br /> Stakin and La out LS 1 $ 8,500.00 $ 8,500.00 <br /> <br />STRt1CTURE $ 4,200,000.00 <br /> Commercial Buiidin 5F 52,000 $ eo.oo $ 4,160,000.00 <br /> Trail Head and Picnic EA 2 $ 20,000.00 $ 40,000.00 <br /> <br />HARI7SCAPE $ 481,400..00 <br /> <br /> Drivewa SF 42000 $ 5.00 $ 210,000.00 <br /> Parkin SF 9600 $ 5.00 $ 48,400.D0 <br /> Concrete Pavement SF 10000 $ 6.00 $ 60,000.00 <br /> Pedestrian Li bting EA 20 $ 3,000.00 $ 60,000.00 <br /> 8' wide Bit. Trail SF 22400 $ 3.50 $ 78,400.00 <br /> Miscelleanous LS 1 $ 25,000.00 $ 25,000.00 <br /> <br />SOF7"SCAPE $ 107,500.00 <br />Zone A AC 15 $ 1,500.00 $ 22,500.00 <br />Zone B AC 15 $ 1,500.00 $ 22,500.00 <br />Zone C AC 7.5 $ 1,540.00 $ 11,250.OD <br />Zone D 1 "Bare Root and 5' H EA 350 $ 75.00. $ 2fi,250.00 <br />Miscellaneous LS 1 $ 25,000.00 $ 25,400.00 <br />Subtotal $ 4,814,400.00 <br />Soft Cost X10°/a} $ 481,440>00 <br />Total $ 5,295,840.00 <br />Contingency (20%) ~ $ 1,059,168.00 <br /> $ fi,355,008.00 <br />.Note' Soft cost includes site engineering design and planning, consulting fees. <br />t <br />Flk River Lancllill End Use Alaster Plan ~6 ~~~ <br />iVaste Atanagernent. Inc. September 20®l <br />