Laserfiche WebLink
``~ <br /><: ~ <br />Phase ~ Preliminary Cost Estimate <br />item Descri tion ; Unit Q Unit Cost Total Cost <br /> <br />SlT~ WORK ~ 24,9o0.at} <br /> Mobilization LS 1 $ 16,fi00.00 $ 1 fi,fi00.00 <br /> Stakin and La out LS 1 $ 8,300.00 $ 8,300.00 <br /> <br />HARDSCAf'E $ 715,300.00 <br /> 8' Wide A -Lime Trai! CY 440 $ 10.00 $ 4,400.00 <br /> Drivewa SF 70000 $ 5.00 $ 350,000.00 <br /> Parkin SF 44000 $ 5.00 $ 200,000.00 <br /> Street Li htin EA 5 $ 7,500.00 $ 37,500.00 <br /> Pedestrian Li htin EA 10 $ 3,000,00 $ 30,000.00 <br /> 8' Wide Bit. Trail SF 22400. $ 3.50 $ 78,400.00 <br /> Miscelleanous LS 1 $ 15,000.00 $ 15,000,00 <br /> <br />S~FTSCAPF $ 85,500.00 <br />Zone A AC 14 $ 1,500.00 $ 21,000.00 <br />Zone B AG 11 $ 1,500.00 $ 1 fi,500A0 <br />Zone C AC 5.5 $ 1,500.00 $ 8,250.00 <br />Zone D 1 "Bare Root and 5' Ht Ever ree EA 330 $ 75.00 $ 24,750.00 <br />Misce{laneous LS 1 $ 15,000.00 $ 15,000.00 <br />Subtotal $ 825,700.00 <br />sort cost ~1o~io~ $ 82,570.00 <br />Total $ 908,270,00 <br />Contingency {20°Ia) $ 181,654.00 <br /> $ 1,089,924.00 <br />Note* Soft cost includes site engineering design and planning, consulting fees. <br />f <br />ilk Rirer k,andtitl end l,~se Master €'ian <br />1Vaste 1lanagement. tnc. <br />3S <br />I.,cRS <br />sep~cember 2002 <br />