My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCSR 2002 Landfill End Use Plan 06-09-2009
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2009
>
06-09-2009
>
PCSR 2002 Landfill End Use Plan 06-09-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2010 9:34:26 AM
Creation date
9/16/2010 9:03:34 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/9/2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j,E <br />Phase 4 Preliminary Cos# Estimate <br />Item Descri tion . Unit Q . Unit Cost Total Cost <br /> <br />S3TE WORft $ 24,900.00 <br /> Mobilization LS 1 $ 1 fi,fi00.00 $ 1 fi,fi00.00 <br /> Stakin and La out LS 1 $ 8,300.D0 $ 8,300.00 <br /> <br />STRUCTURE $ 50,Ot10.Of! <br /> Overlook EA 1 $ 50,000.00 $ 50,000.00 <br /> <br />#-#ARDSCAPE $ 19,400.00 <br /> 8' Wide A -f_ime Trail CY 440 $ 10..00 $ 4,400.00 <br /> Miscelleanous LS 1 $ 15,000.00 $ 15,000.00 <br /> <br />S©FTSCAPE $ 85,500.00 <br />Zone A AC 14 $ 1,500.D0 $ 21,000.00 <br />Zone B AC 11 $ 1,500.00 $ 16,500.00 <br />zone c AC 5.5 $ 1,sDD.oo $ s,25o.00 <br />Zone fQ 1"Bare Root and 5' Ht Ever reen EA 330 $ 75.00 $ 24,750.00 <br />Miscellaneous LS 1 $ 15,000.00 $ 15,000,00 <br />Subtotal $ 179,800.00 <br />Soft Cost (10%} $ 17,980,00 <br />Total $ 197,780,00 <br />Contingency {20%~ $ 39,556.00 <br /> $ 237,33fi.00 <br />Note'` Soft cost includes site engineering design .and p{arming, consulting tees. <br /> <br />Elk Ri~~er Land}iif End Use Alaster Plan '~~ tlRS <br />1Vaste ;Management. Inc. September 20(}2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.