My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. SR 06-21-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
06-21-2010
>
5.8. SR 06-21-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2010 3:28:38 PM
Creation date
6/18/2010 2:39:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCEPT EVALUATION <br /> <br />n <br />~~ <br />» Long term interchange located at existing ~7~st Avenue signal <br />location. <br />» Concensus o f the City o f Elk River was the interchange located here <br />would be challenging. Dimensional constraints and existing developed <br />properties would drive up the overall cost o f the interchange, and <br />may displace more business than attract new ones. <br />scenario 4 <br />» Long-term interchange location similar to what was identified in the <br />Phase One study for the FAST area, somewhere between 67th and <br />65th Avenue. <br />» Consensus o f the City o f Elk River was that this approach to the long- <br />termtransportation patterns makes the most sense. The location is in <br />close proximity to existing business and the Northstar commuter rail <br />station and would be located in currently undeveloped land. <br />» Options to explore further with this concept were also discussed. <br />The potential to have a near term signal at 67th or at the future <br />interchange location should be further explored in lieu o f 65th Avenue <br />to create a stronger near term connection to the existing business, the <br />• Gateway industrial park and a more direct, second access to Highway <br />io f rom the Northstar commuter rail station. <br />22 p 171St. CN2f1U2 Focused Area S7udy <br />j ;^ <br />Scenario 3: Scenario 4: <br />» Interim signals at t7~st Avenue and 65th Avenue » Interim signals at the existing ~7~st Avenue and 65th Avenue <br />intersections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.