My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.8. SR 06-21-2010
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2010
>
06-21-2010
>
5.8. SR 06-21-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2010 3:28:38 PM
Creation date
6/18/2010 2:39:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/21/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCEPT EVALUATION <br /> <br />• <br />LAND USE AND TRANSPORTATION <br />ALTERNATIVES <br />Once a general approach to the future transportation patterns was agreed to, the <br />consulting team explored a range of concept alternatives for land use and local <br />transportation patterns. Since the land use patterns north of the rail road tracks were <br />not anticipated to change from the phase one plan, the following concepts address <br />land use, connectivity and transportation from the BNSF rail line, west across Highway <br />~o~i6g to the Mississippi River. The following are the four concept alternatives with <br />corresponding pros and cons for each: <br />CONCEPT ALTERNATIVE #1 <br />Pros <br />Continuous public access to the river <br />Increased housing options on the river <br />Broad open space connections <br />Prominent civic uses along the river <br />Cons <br />Transition of existing single family <br />neighborhood <br />Limited highway commercial uses at the <br />future interchange <br />
The URL can be used to link to this page
Your browser does not support the video tag.