My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. PCSR 06-08-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2006-2010
>
2010
>
06-08-2010
>
5.6. PCSR 06-08-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2010 11:00:21 AM
Creation date
6/4/2010 3:30:40 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/8/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEVELOPMENT CHARACTER <br />THE PINNACLE <br />-~ The Pinnacle sub-area is <br />~.~ ` -` the narrow, under- <br />j ~ utilized area in the far <br />~~,~.~,..~~ ~ northwest of the study <br />'", ,-.-. area between the rail <br />- ~ -~ line and Highway ~o~~6g. <br />~-' <br />Access is challenging for <br />much of the site, but an <br />opportunity exists with strong highway <br />visibility. The timing of access changes <br />along Highway io~i69 will have large <br />effect on development and redevelopment <br />in this district. <br />NEAR-TERM <br />With limited access and numerous small <br />parcels it is unlikely major redevelopment <br />will occur in this sub-area in the near- <br />term. Rather, capitalizing on recent <br />investments with the extension of <br />Vance Avenue, select small industrial <br />users with limited access needs and <br />relatively limited investment fit for the <br />undeveloped portion of the district. <br />Redevelopment of the two vacant sites <br />north of 73rd Avenue could allow for <br />office or office showroom uses, however, <br />a median crossing will be closed at 173rd <br />Avenue with the planned zoi3 MN DOT <br />resurfacing project could impact any high <br />traff=ic uses. <br />The frontage road will remain as the <br />primary access for uses along Highway <br />io~i6g, but the intersection at 73rd <br />Avenue should be reconstructed further <br />east with any redevelopment for <br />additional safety measures. Extending <br />Vance Avenue to the frontage road and <br />the addition of district signage icons will <br />help increase visibility for small business <br />behind the frontage road users. As these <br />uses evolve, steps should be taken to <br />:::. ~~> <br />~. -- e§:a <br />~` - <br />`, <br />1:x1 <br />~~4 <br />~~ <br />~~ az <br />~~v <br />~` ~ <br />The Pinnacle Sub Area -Near Term Vignette Study <br />•t~ :cc saga <br />:' ~~ <br />create attractive building fronts and organizing the development pattern. The <br />organization must include well landscaped parking to the front or side of the <br />building, and well screened loading and storage areas located behind the buildings. <br />Stormwater treatment can take on an entire sub-area approach and become <br />internal to the larger blocks of development. This framework of streets, utilities and <br />Stormwater treatment sets the stage for broader long term redevelopment which <br />could occur with an additional access to the north. <br />52 17'13t. C]VE`nU2 Focused Area STudy <br />
The URL can be used to link to this page
Your browser does not support the video tag.