Laserfiche WebLink
RESULTS AS OF 11/17/95 <br />39 of 89 Returned <br />RIVERVIEW HEIGHTS QUESTIONNAIRE <br />NAME: ADDRESS: <br />1. What year was your home built? <br />2. <br />What is the condition of your septic system? <br />Good 2$ Fair 4 Showing signs of failure 4 Don't know 2 <br />3. <br />When was your septic system last upgraded? <br />More than 10 years 12 5 -10 years 9 0 -5 years 11 Don't know 6 <br />4. <br />What is the condition of your well? <br />Good 29 Fair 5 Showing signs of failure 0 Don't know 4 <br />5. <br />When was your well last upgraded? <br />More than 10 years 8 5 -10 years-j5 0 -5 years ___6_ Don't know 8 <br />6. <br />How is the storm drainage in your neighborhood? <br />Adequate 32 Needs improvement 5 <br />7. <br />How is the condition of the streets in your neighborhood? <br />Adequate 9 Needs some work 12 Needs major work 17 <br />• <br />8. <br />Your street is scheduled for overlayment in 1996. The estimated cost is $1,750 to $2,000 <br />per property. The useful life of an overlay is 8 to 12 years, during which utility <br />construction would likely not be considered. Would you prefer that utilities and new street <br />construction be looked at and discussed prior to considering an overlay project? <br />Consider utilities and new street prior to overlayment. <br />Just consider an overlay project. 22 <br />9. <br />Given the financial information contained on the attached sheet, are you in favor of a <br />neighborhood information meeting to further discuss this issue with the City? <br />Yes 27 No 10 <br />Additional Comments: <br />is If you have any questions or would like to talk to somebody directly, please contact Terry <br />Maurer, City Engineer, at 644 -4389. <br />2301286- 2514.sep <br />