Laserfiche WebLink
• <br />• <br />RESULTS AS OF 11/15/95 <br />RIVERVIEW HEIGHTS QUESTIONNAIRE <br />NAME: ADDRESS: <br />1. What year was your home built? <br />2. What is the condition of your septic system? <br />Good 22 Fair 4 Showing signs of failure 4 <br />3. When was your septic system last upgraded? <br />More than 10 years 9 5 -10 years 8 0 -5 years 9 <br />4. What is the condition of your well? <br />Good 25 Fair 3 Showing signs of failure 0 <br />5. When was your well last upgraded? <br />More than 10 years 7 5 -10 years 10 0 -5 years 6 <br />6. How is the storm drainage in your neighborhood? <br />Adequate 28 Needs improvement 3 <br />Don't know 2 <br />Don't know 6 <br />Don't know 4 <br />Don't know 8 <br />7. How is the condition of the streets in your neighborhood? <br />Adequate 7 Needs some work 11 Needs major work 14 <br />8. Your street is scheduled for overlayment in 1996. The estimated cost is $1,750 to $2,000 <br />per property. The useful life of an overlay is 8 to 12 years, during which utility <br />construction would likely not be considered. Would you prefer that utilities and new street <br />construction be looked at and discussed prior to considering an overlay project? <br />Consider utilities and new street prior to overlayment. 12 <br />Just consider an overlay project. 18 <br />9. Given the financial information contained on the attached sheet, are you in favor of a <br />neighborhood information meeting to further discuss this issue with the City? <br />Yes 24 No 8 <br />Additional Comments: <br />If you have any questions or would like to talk to somebody directly, please contact Terry <br />Maurer, City Engineer, at 644 -4389. <br />230/286- 2514.sep <br />